Orange County NC Website
3 <br /> Ms. Pamela K. Jones <br /> Page 2 <br /> October 11, 1993 <br /> • New exterior stair <br /> 600 s.f. x $85/s.f. = $51,000 <br /> • 3rd Floor stair connector <br /> 100 s.f. x $100/s.f. = $10,000 <br /> • Contingency @ 10% $22.930 <br /> Total estimated cost of construction = $252,230 <br /> Architectural/Engineering Fee: <br /> • Programming for 3rd Floor <br /> Hourly (as per attached fee schedule) <br /> • Provide complete A/E services as per the attached agreement <br /> for a fixed fee based on 12% of the total estimated <br /> cost of construction for the approved scope of work. If all <br /> the above is included then; <br /> $252,230 (12%) = $30,270 <br /> We would be delighted to work with you to further refine the scope of work. We understand <br /> the urgency of this project and are ready to commit our staff immediately to enable the courts <br /> to make the changes necessary to give them an efficient, functional space on the third floor that <br /> meets all code requirements. <br /> We look forward to hearing from you and encourage you to call concerning any elements of <br /> our proposal. <br /> Sincerely, <br /> Grier-Fripp Architects, P.A. <br /> ew,.4;.vt <br /> Alan T. Baldwin, AIA <br /> President <br /> ATB/ad <br /> Enclosures (2) <br /> cc: Bill Fripp <br /> Bill Hartsell <br />