Orange County NC Website
DocuSign Envelope ID:418ADAA3-2F7B-4243-AF32-4541 C164B6FA <br /> 9. Concrete Retaining Walls: All walls reduced from 12-inches to 9-inches thick. <br /> Reinforcement to remain as originally designed. <br /> 10. Extend Bid Prices: Due to negotiation time frame and need to gain County <br /> Administration approval for project, bid prices will be held an additional 60 days <br /> (February 8'2017). <br /> Total negotiated new contract price for all work and negotiated items is to be Three Million One <br /> Hundred Thousand Dollars ($3,100,000.00). <br /> By signature below, all parties are in agreement with the negotiated scope and contract price: <br /> r <br /> / <br /> Engineer: Contractor: Owner: / <br /> 7 Signature <br /> Signa ure Signature <br /> C.Tyrus Clayton, Jr,PE Manager Gordon Dively,PEf <br /> Draper Aden Associates D. H. Griffin Infrastructure,LLC Orange County Solid Waste <br /> Attachments: 1. Haul Road Exhibit <br /> 2. New Site Layout -Pavement Revisions (Sheet C6.0) <br /> 3. Revised Pavement Sections <br /> 4. Revised Concrete Details(Sheet C6.2) <br /> C:\Users\dcartcr\AppData J.ocalllvticrosof\W indows\Temporary Internet Files\Content.OutlookWQX3OHE\V\MEM 16 1209 Memorandum of Negotiation CTC Jr Revised.docx <br />