Browse
Search
2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 3:45:11 PM
Creation date
2/13/2017 2:10:37 PM
Metadata
Fields
Template:
Contract
Date
1/17/2017
Contract Starting Date
1/17/2017
Contract Ending Date
11/30/2017
Contract Document Type
Agreement - Construction
Agenda Item
6/2/15
Amount
$3,100,000.00
Document Relationships
R 2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:418ADAA3-2F7B-4243-AF32-4541C164B6FA <br /> General Subcontractor: Plumbing Subcontractor: <br /> 6-x/Ff 1,-AtczAsrp.dcwitz Lic ,C6c0,5- I 01-Tgrel( Loqew Lic ?7737 <br /> Mechanical Subcontractor: Electrical Sccbcorntr77: „in L. <br /> ToKufZ A.4-;14,c- : AL Lic <br /> GS143-128(d) requires all single prime bidders to identify their subcontractors for the above <br /> subdivisions of work. A contractor whose bid is accepted shall not substitute any person as <br /> subcontractor in the place of the subcontractor listed in the original bid, except (i) if the listed <br /> subcontractor's bid is later determined by the contractor to be non-responsible or non-responsive or the <br /> listed subcontractor refuses to enter into a contract for the complete performance of the bid work, or(ii) <br /> with the approval of the awarding authority for good cause shown by the contractor. <br /> The bidder further proposes and agrees hereby to commence work under this contract on a date to be <br /> specified in a written order of the designer and shall fully complete all work thereunder within the time <br /> specified in the General Conditions Article 13. Applicable liquidated damages amount is also stated in <br /> the General Conditions Article 13. <br /> Eubanks Rd.Waste&Recycling Center Improvements R00592-167N <br /> Orange County Solid Waste September 2016 Revised 10/10/16 <br /> BF-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.