Browse
Search
2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 3:45:11 PM
Creation date
2/13/2017 2:10:37 PM
Metadata
Fields
Template:
Contract
Date
1/17/2017
Contract Starting Date
1/17/2017
Contract Ending Date
11/30/2017
Contract Document Type
Agreement - Construction
Agenda Item
6/2/15
Amount
$3,100,000.00
Document Relationships
R 2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:418ADAA3-2F7B-4243-AF32-4541C164B6FA <br /> material that cannot be moved or ripped with a Caterpillar D8 equipped <br /> with a single tooth ripper or approved equal. A demonstration may be <br /> required. Rock shall be removed from rock surface to 1 foot below <br /> proposed sub grade. The destination of the removed rock will be directed <br /> by Owner. Payment for this item shall be made on a unit price basis <br /> wherein measurement will be made. <br /> 9. Jack & Bore 6' Sewer Service: This Work consists of furnishing all <br /> materials, labor, equipment, and appurtenances necessary to install of a 6" <br /> PVC Sewer Service in a 12" Steel Casing. Assume the minimum length of <br /> the bore will be 45 linear feet. Payment for this item shall be made on a <br /> unit price basis wherein measurement will be made. <br /> UNIT COST DEVIATIONS <br /> The Contractor is responsible for providing Unit Prices consistent with typical industry norms for the <br /> Work described. Unit Prices which appear inconsistent with typical prices for similar Work shall be <br /> justified by the Contractor at the request of the Engineer. Providing Unit Prices which do not <br /> reasonably reflect the Work described, either high or low, which are not justified satisfactorily to the <br /> Engineer, may deem the BIDDER non-responsive and invalidate their Bid. <br /> ALTERNATES: <br /> ADD ALTERNATE 1 <br /> Item Description Unit Estimated Unit Price Total Cost <br /> Quantity <br /> AA-1 45'x176' Storage Building with Sloped LS $ <br /> Roof and Gravel Approach Apron 000, <br /> TOTAL ADD ALTERNATE 1 <br /> —17,70 14,„.90 a-0 1740. :,-r-1 '77-+-tosswo CuoTS Dollars <br /> ( use words ) <br /> ADD ALTERNATE 2 <br /> Item Description Unit [Estimated Unit Price Total Cost <br /> Quantity <br /> AA-2 Landfill Road Asphalt Overlay IS $ 000. do <br /> TOTAL ADD ALTERNATE 2 <br /> g, zuo c9/0\t5 <br /> Dollars <br /> ( use words) <br /> Eubanks Rd.Waste& Recycling Center Improvements R00592-167N <br /> Orange County Solid Waste September 2016 Revised 10/10/16 <br /> BF-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.