Browse
Search
2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 3:45:11 PM
Creation date
2/13/2017 2:10:37 PM
Metadata
Fields
Template:
Contract
Date
1/17/2017
Contract Starting Date
1/17/2017
Contract Ending Date
11/30/2017
Contract Document Type
Agreement - Construction
Agenda Item
6/2/15
Amount
$3,100,000.00
Document Relationships
R 2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:418ADAA3-2F7B-4243-AF32-4541C164B6FA <br /> 2. UNDERCUT AND BACKFILL UNSUITABLE SOILS: This work shall <br /> consist of furnishing all equipment, materials, labor and appurtenances <br /> necessary to remove and replace unsuitable soils at the site as identified by <br /> the CQC Representative and approved by Engineer. Work shall include <br /> the excavation, transport, and stockpiling of unsuitable soil at a location to <br /> be determined by the Owner, and the replacement of the unsuitable soil <br /> with on-site soils to achieve a satisfactory subbase as determined by the <br /> CQC Representative. No payment will be made for such excavation and <br /> backfill 1 foot or less than the finished base grade. Payment for this item <br /> shall be made on a unit price basis, wherein measurement will be made in <br /> the presence of Engineer, Owner's Representative, or RPR. <br /> 3. STRUCTURAL FILL: This Work shall consist of furnishing all materials, labor, <br /> equipment, and appurtenance necessary to complete structural fill <br /> required to achieve subgrade. Cost shall include placement of excavated <br /> material within the Work as structural fill. Payment for this item shall be <br /> made on a unit price basis, wherein measurement will be made by certified <br /> survey paid by the Contractor. <br /> 4. ASPHALT PAVING: This work shall consist of furnishing all materials, <br /> labor, equipment, and appurtenances necessary to construct paved <br /> surfaces. Work to include asphalt aggregate course, prepared surface, tack <br /> coat, prime coat. Payment for this item shall be made on a unit price basis, <br /> wherein measurement will be made by survey. Pavement thickness shall be <br /> per the standard detail on Sheet <br /> 5. AGGREGATE BASE COURSE: This work shall consist of furnishing all <br /> materials, labor, equipment, and appurtenances necessary to construct <br /> aggregate roads and other areas. Work to include prepared surface and <br /> aggregate. Payment for this item shall be made on a unit price. Basis <br /> wherein measurement will be made by survey, <br /> 6. SEEDING: This Work consists of furnishing all materials, labor, equipment, <br /> and appurtenances to provide temporary & permanent seeding to those <br /> areas located outside of the limits of construction designated on the <br /> Drawings. Areas must be approved by the Engineer. Payment for this item <br /> shall be made on a unit price basis, wherein measurement will be made by <br /> survey. <br /> 7 GROUNDWATER COLLECTION TRENCHES: This Work consists of <br /> furnishing all materials, labor, equipment, and appurtenances necessary to <br /> install collection trenches (2 'x2') as needed. The item is intended to be <br /> used in the event "wet" areas occur within the subgrade. Work to include <br /> excavation, placement of washed crushed stone (NCDOT No. 57 or 67) <br /> encased in a 4 oz non-woven geotextile filter fabric. Any damage caused to <br /> the prepared subgrade during the completion of this work under this item, <br /> including but not limited to, rutting, tracking, or movement of soil shall be <br /> repaired by the Contractor at no additional cost to the Owner. Payment for <br /> this item shall be made on a unit price basis wherein measurement will be <br /> made. <br /> 8. ROCK REMOVAL: This work shall consist of furnishing all materials, <br /> labor, equipment and appurtenances necessary to complete the removal of <br /> unwanted rock by means of hoe ram equipment. Rock is defined as natural <br /> Eubanks Rd.Waste&Recycling Center Improvements R00592-167N <br /> Orange County Solid Waste September 2016 Revised 10/10116 <br /> BF-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.