Browse
Search
2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 3:45:11 PM
Creation date
2/13/2017 2:10:37 PM
Metadata
Fields
Template:
Contract
Date
1/17/2017
Contract Starting Date
1/17/2017
Contract Ending Date
11/30/2017
Contract Document Type
Agreement - Construction
Agenda Item
6/2/15
Amount
$3,100,000.00
Document Relationships
R 2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:418ADAA3-2F7B-4243-AF32-4541C164B6FA <br /> Unit Cost Schedule <br /> Bidder Provides the following unit costs as a means of determining the value of Work added to or <br /> deleted from the Contract: <br /> Item <br /> Description Unit Unit Cost <br /> No. <br /> 1. Excavation CY $ " /CY <br /> 2. Structural Fill CY ee /CY <br /> 3. Asphalt Paving SY $ 1-ic5, 00 isy <br /> 4. Aggregate Base Course SY $ 1 G 66 /SY <br /> 5. Seeding AC $ Yee- e /AC <br /> 6. Groundwater Collection Trenches LF °@ /LF <br /> 7. Rock Removal CY $ ." /CY <br /> 8 Jack and Bore 6" Sewer Service with <br /> LF $ 3c c."' /LF <br /> 12" Steel Casing <br /> UNIT COST SCHEDULE MEASUREMENT AND BASIS FOR PAYMENT <br /> The line items below provide further description of the items included in the unit cost schedule and <br /> shall be used as a means of determining the value of Work added to or deleted from the Contract. The <br /> Unit Cost Schedule generally outlines each item and the corresponding unit price listed by the <br /> Contractor. The price associated with each item shall be the full compensation paid for the Work <br /> described, regardless of the items. <br /> No payment for unit cost items shall be made without prior approval of Owner. <br /> The Contractor shall provide quantity justification with pay requests for items paid on a unit rate basis. <br /> Quantities for unit price bid items shall be calculated based on the measurement, The Engineer <br /> reserves the right to make final decision regarding those quantities. <br /> UNIT COST ITEMS: <br /> 1. EXCAVATION: This Work shall consist of furnishing all necessary <br /> materials, labor, equipment, and appurtenances necessary to excavate soil <br /> material at the site as approved by the Engineer. Progress payment will be <br /> made by truck/scrapper count or by a survey performed by the Contractor. <br /> The Owner may perform verification surveying at the Owner's expense. <br /> Payment for this item shall be on a unit price basis wherein measurement <br /> will be made by certified survey paid by the Contractor. The Owner and/or <br /> Engineer will make final judgment of the quantities. <br /> Eubanks Rd, Waste&Recycling Center Improvements R00592-167N <br /> Orange County Solid Waste September 2016 Revised 10/10/16 <br /> BF-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.