Browse
Search
2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 3:45:11 PM
Creation date
2/13/2017 2:10:37 PM
Metadata
Fields
Template:
Contract
Date
1/17/2017
Contract Starting Date
1/17/2017
Contract Ending Date
11/30/2017
Contract Document Type
Agreement - Construction
Agenda Item
6/2/15
Amount
$3,100,000.00
Document Relationships
R 2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:418ADAA3-2F7B-4243-AF32-4541 C164B6FA <br /> 38 <br /> the previous calendar month, and shall sum up the financial status of the Work with the <br /> following information: <br /> a) Total Contract Price, including any adjustment thereto made pursuant to the Contract <br /> Documents. <br /> b) Value of Work completed and materials properly stored to date. <br /> c) Less amount retained. <br /> d) Less previous payments. <br /> e) Current amount due. <br /> f) Balance remaining. <br /> The Contractor, upon request of the Designer, shall substantiate the request with invoices, <br /> vouchers, payrolls, or other evidence. <br /> 20.3 When payment is requested or made on an account of stored materials, such materials <br /> must be stored on the Owner's property at such places and in such a manner as may be <br /> designated by the Designer. However, in the sole discretion of the Owner, with permission <br /> in writing from the Designer and Owner and under such circumstances as may be determined <br /> by the Owner, such materials may be stored in a bonded warehouse. The location and <br /> conditions for storage of such materials away from the Owner's property in a bonded warehouse <br /> shall be within the sole discretion of the Owner. Requests for Payment on account of stored <br /> materials shall be accompanied by paid invoices, bills of sale, warehouse receipts, or other <br /> documentary evidence establishing Owner's title to such materials, evidence that the stored <br /> materials are insured against loss and damage, and such other documentation as required by <br /> the Designer. Responsibility for the quantity, quality, and condition of such stored materials, <br /> whether stored on the Owner's property or away from the Owner's property, shall remain with <br /> the Contractor regardless of ownership or title. No payment shall be made on account of <br /> materials stored in a bonded warehouse unless the Contractor has acquired written permission <br /> from the Designer for such storage of materials and has complied with all conditions set forth in <br /> such permission regarding such storage of materials in a bonded warehouse. <br /> 20.4 Any Request for Payment received by the Designer on or before the fifth (5th) of the <br /> calendar month shall be certified for payment or returned for re-submission to the Contractor on <br /> or before the fifteenth (15th) of the calendar month. The Designer's certification shall be for the <br /> amount which was requested or that which the Designer has decided was justly due, and shall <br /> state in writing to the Contractor and Owner the reasons for withholding payment of any or all of <br /> the amount requested. <br /> 20.5 The Designer may fail to certify all or part of any payment requested for any of the <br /> following reasons: <br /> a) Defective Work not corrected. <br /> Revised 6/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.