Browse
Search
2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 3:45:11 PM
Creation date
2/13/2017 2:10:37 PM
Metadata
Fields
Template:
Contract
Date
1/17/2017
Contract Starting Date
1/17/2017
Contract Ending Date
11/30/2017
Contract Document Type
Agreement - Construction
Agenda Item
6/2/15
Amount
$3,100,000.00
Document Relationships
R 2017-072-E SW - D.H. Griffin Infrastructure, LLC to construct Eubanks Rd. Waste and Recycling Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:418ADAA3-2F7B-4243-AF32-4541 C164B6FA <br /> 6 <br /> make such request sufficiently in advance of such date as to avoid any such delay. The <br /> Designer shall respond in writing to the Request for Information by the date stated by the <br /> Contractor unless he cannot reasonably do so, in which case he shall prior to that date notify <br /> the Contractor of the date by which he can reasonably respond. The Contractor shall not be <br /> entitled to any additional time for the completion of the Work or any portion thereof by reason of <br /> the Designer's failure to respond if he has not submitted his Request for Information sufficiently <br /> in advance to allow the Designer a reasonable time within which to respond. <br /> 1.33 Request for Payment - The form, in the form of AIA Document G702 (latest ed.) or other <br /> published document approved by Owner, which is to be used by the Contractor in requesting <br /> progress payments and which is to include a Schedule of Values as required by the Contract <br /> Documents and an affidavit of the Contractor that progress payments theretofore received from <br /> the Owner on account of the Work have been applied by the Contractor to discharge in full all <br /> the Contractor's obligations incurred in connection with Work covered by all prior applications for <br /> payment. See paragraph 20.2. <br /> 1.34 Resident Superintendent- That person designated by the Contractor in accordance with <br /> paragraph 7.2 who has day-to-day responsibility for the prosecution of the Work and the <br /> obtaining of proper materials and equipment, and adequate labor and who shall have the <br /> authority set forth in the last sentence of paragraph 7.2. <br /> 1.35 Schedule of Values - Any breakdown of the Contract Price which may be required by the <br /> Contract Documents, and designated as such. See paragraph 20.1. <br /> 1.36 Specifications - That portion of the Contract Documents consisting generally of the written <br /> requirements for materials, equipment, construction systems, standards, and workmanship for <br /> the Work and performance of related services. <br /> 1.37 Subcontractor- A person, firm, or corporation who has entered into a direct contract with <br /> the Contractor to perform any of the Work at the Project. <br /> 1.38 Submittal - Shop drawings, product data, samples, and other documents required by the <br /> Contract Documents to be submitted by the Contractor to the Designer. <br /> 1.39 Submittal Register- See paragraph 13.2 of these General Conditions. <br /> 1.40 Substantial Completion - The point at which the Work, and Work by other Contractors on or <br /> in connection with the Project, as determined by the Designer, is sufficiently complete in <br /> accordance with the Contract Documents that it can be beneficially occupied by the Owner, and <br /> the Work can be utilized by the Owner for its intended use, and all necessary permits and <br /> permissions for Beneficial Occupancy and utilization having been obtained by the Contractor. All <br /> operations and maintenance manuals, Owner training, and as-built drawings must be submitted <br /> prior to Substantial Completion being achieved. <br /> 1.41 Sub-subcontractor- A person or entity that has a direct or indirect contract with a <br /> Subcontractor to perform any of the Work at the Project. <br /> Revised 6/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.