Browse
Search
2017-066-E AMS - Statler Gilfillen for study of construction methods and materials comparison
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-066-E AMS - Statler Gilfillen for study of construction methods and materials comparison
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 10:23:42 AM
Creation date
2/13/2017 11:38:15 AM
Metadata
Fields
Template:
Contract
Date
2/9/2017
Contract Starting Date
2/9/2017
Contract Ending Date
2/28/2017
Contract Document Type
Contract
Amount
$570.00
Document Relationships
R 2017-066-E AMS - Statler Gilfillen for study of construction methods and materials comparison
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:94E07DAC-9000-4DE4-88D2-16ED6424D6FC <br /> SPECIFIC WORK TO BE PROVIDED <br /> EXISTING CONDITIONS <br /> Work begins with preparation of existing conditions CAD drawings for each of the five <br /> sites. The initial site review was for general design parameters at each site and not a detailed <br /> existing conditions documentation. We will prepare existing conditions drawings based on the <br /> CAD files provided. Additional information and verification of the CAD drawings will be verified <br /> as necessary. <br /> SCHEMATIC DESIGN <br /> Working from these existing condition drawings we will create a set of designs for each site for <br /> approval of County and possible preliminary construction pricing. At this stage I can generate <br /> one or two design as necessary for County to determine best alternatives. For example,we <br /> reviewed two specific alternatives at Solid Waste. At this stage, my role is to create a design <br /> showing these alternatives so that informed approvals can be made. <br /> CONSTRUCTION DOCUMENTS <br /> Once design approvals are given, changes will be incorporated into a set of Construction <br /> Documents. In preparation products and finished, we assume that products and finishes are <br /> "to match" the existing conditions.The construction documents we are preparing are for the <br /> purpose of securing a building permit and not as a formal set of construction bid documents. <br /> Our work assumes that Orange County will provide the specifications regarding signage. <br /> FIELD REVIEW <br /> Gilfillen Architect will need to make 3 visits: at initial phase for questions, during construction, <br /> and final sign off. Possible additional visits as necessary for unforeseen issues or questions. <br /> ENGINEERING <br /> HVAC, electrical and plumbing will be under this contract. Structural engineering as necessary <br /> would be an extra. <br /> COST OF SERVICES <br /> Based on a construction cost estimated to be$100,000.The cost of Architectural, HVAC, <br /> electrical and plumbing as outlined will be$8,700. <br /> Statler Gilfillen Architect <br /> 3302 St. Marys Road <br /> Hillsborough, NC 27278 <br /> 919-732-6123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.