Orange County NC Website
15 <br /> 2016-2017 <br /> OCBRIP Update <br /> North-South Corridor Study Kick-Off(map) <br /> Outreach <br /> Significant public involvement throughout the study: open houses, community meetings, <br /> updates to various stakeholders and Boards. <br /> Regular Committee Meetings over 30-months schedule: Technical and Policy Committees. <br /> Rounds of presentations to conclude the study: <br /> • Chapel Hill Town Council —April, 2016 <br /> • BOCC — May, 2016 <br /> • DCHC MPO —August, 2016 <br /> Decision-Making Process <br /> Process guided by: <br /> The Technical and Policy Committee <br /> • Review of the technical analysis <br /> • Review project deliverables <br /> • Develop and approve recommendations <br /> Members of the public <br /> • Provide input and feedback throughout the study process <br /> Study Committees Participants <br /> North Carolina Department of Transportation <br /> Town of Chapel Hill/Chapel Hill Transit <br /> Town of Carrboro <br /> University of North Carolina at Chapel Hill <br /> UNC Health Care <br /> Chapel Hill-Carrboro Chamber of Commerce <br /> Downtown Partnership <br /> Orange County <br /> GoTriangle <br /> Chapel Hill Transportation Board <br /> Carrboro Transportation Advisory Board <br /> Durham-Chapel Hill-Carrboro MPO <br /> Chair Dorosin referred to slide number 12, and asked if a decision of which of the three <br /> alternatives (dedicated curb lane: new construction; dedicated center lane: new construction; <br /> or dedicated curb lane: convert existing lane) will be made in the timeframe noted on the slide. <br /> Brian Litchfield said yes, this decision will be made between FY17-18. <br /> Commissioner Rich asked if there is a need to acquire additional land with any of the <br /> three options. <br />