Orange County NC Website
E . STATE PERMITS REQUIRED <br /> 1 . Does the project involve the mining of earth products? <br /> :f so, how many cubic feet of mate-'a' are be <br /> excavated: <br /> Has an abdication for a ':inio.c Permit teen suoT_ttec to <br /> NCDRCD? <br /> Please attach map _ndicaz nc expected extent of oroposed <br /> activity . <br /> 2 . Does the project involve generation or storage of <br /> hazardous or toxic wastes, as identified by the <br /> Environmental Protection Agency? (A listinc of all <br /> hazardous materials is available from the - _an.._n c <br /> Department) <br /> Describe the wastes to be cenerated. <br /> How much material is expected to be generated ter month? <br /> Will any material be treated onsite? <br /> Volume? <br /> Will any material be stored onsite? <br /> Volume? <br /> Where will disposal of the material take place? <br /> How will materials be transported to the disposal site? <br /> What measures are proposed to protect water q:ialitv and <br /> air duality in case of spills? <br />