Orange County NC Website
art safeguards to protect water quality. All fuel and asphalt storage tanks will be above ground, <br /> mounted on a concrete pad and surrounded by a concrete containment wall capable of holding <br /> the contents of all tanks within the containment. <br /> The pad of the containment structure will be sloped so all internal flow travels to a concrete sump <br /> for easy removal. Rainfall entering the containment structure will be passed through an oil/water <br /> separator. All petroleum products collected by the separator will be placed in a waste oil tank <br /> which will be emptied regularly. Water from the separator will be placed in a pond which will also <br /> be equipped with two devices to protect against oil pollution. The first is an inverted siphon <br /> which would permit only water from below the pond surface to discharge into the settling basin. <br /> The second device consists of placing oil absorbing material on the ponds surface to absorb any <br /> oil passed by the separator to the siphon. <br /> As a further precaution against fuel contaminants, the entire area in which fuels and asphaltic <br /> materials will be stored, processed, and handled will be graded so that natural surface flows will <br /> be directed to the pond mentioned above. The two methods described above will remove any <br /> oil which might enter this pond. The clean water from this pond will pass through an inverted <br /> siphon to a sedimentation basin which will hold any soil which might be present in the runoff <br /> water. Because this basin will be protected from having oil enter it, no liner is needed. <br /> The entire erosion control plan has been designed so that no oil or petroleum products will either <br /> enter the soil or be carried offsite in stormwater runoff, and the plan also provides for silt fencing <br /> and a settling pond for the construction phase. The completed site will have a total of three <br /> ponds to contain runoff water. Any earthen berms and land disturbance areas will be vegetated <br /> in accordance with the Soil Erosion Control Plan,as detailed under the Seedbed Preparation and <br /> Seeding Schedule. Ponds are designed to handle a 100-year storm event. <br /> In consideration of the plant's sensitive location, the usual industry practice of spraying beds of <br /> haul trucks with petroleum based solvent to prevent adhesion to the truck bed will not take place. <br /> Instead anti-adhesion will be accomplished using a non-p:fluting biodegradable product. <br /> A 401 water quality certification has been issued by the North Carolina Division of Environmental <br /> Management for the quarry portion of the project. <br /> 4-7 <br />