Browse
Search
Agenda - 10-14-1993 - D 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 10-14-1993
>
Agenda - 10-14-1993 - D 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 11:16:40 AM
Creation date
2/7/2017 11:13:54 AM
Metadata
Fields
Template:
BOCC
Date
10/14/1993
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
D 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.5.7 Blasting <br /> The sole purpose of blasting at rock quarry sites is to break the rock loose from its geologic <br /> formation and permit easy processing. Blasting is still the only means available to free the rock <br /> and is undertaken only when the need for material requires it. <br /> A common misconception is that blasting is an uncontrolled activity. Blasting is planned and <br /> engineered to produce the quantity, quality and size of product needed. Each blasting event is <br /> specifically designed on the type of material present in the blast area and the size of stone <br /> required. These requirements determine the number, depth,and spacing of the 5-1/2"bore holes <br /> to receive the explosive charge, the amount of charge to be placed in each bore hole and the <br /> sequence of the explosions. Sequence of explosions is the interval and order in which each bore <br /> hole will be detonated. All bore holes do not detonate at one time but detonate milliseconds <br /> apart. Sequencing is accomplished at the quarry by two mechanisms: time delayed blasting caps <br /> and computerized detonation system. The purpose of each is to produce a number of smail <br /> explosions rather than one large one, thereby reducing vibrations and hazards and intentionally <br /> creating blast waves which cancel each other out. <br /> To accomplish this, the engineered bore holes are filled with approximately 5 feet of high <br /> explosive material followed by a time delayed cap (normally 8 millisecond delay). On top of this <br /> cap is placed approximately 23 feet of insensitive explosive material consisting of fertilizer and <br /> fuel oil. This material is hauled to the site the morning of the blast in a specialized truck which <br /> keeps the fertilizer and oil separate until it enters the bore hole. A second time delayed blasting <br /> cap is placed on top of the fertilizer followed by another 5 feet of high explosive and capped off <br /> with 15 feet of aggregate and fine screening to form a plug. The purpose of the second time <br /> delayed blasting cap is "fail safe" to insure detonation. During detonation an electrical current is <br /> sent to the blasting cap which detonates the high explosive, thereby detonating the insensitive <br /> explosive. With 8 milliseconds,a second bore hole would detonate and so on until all bore holes <br /> are detonated. <br /> During normal operations of the quarry, blasting will occur approximately 1-1/2 times per week <br /> with a duration of approximately 1/4 second per blast. <br /> Prior to blasting events, a seismograph is placed in the quarry area at different locations for <br /> different shots to determine ground motion and air pressure pulse caused by the event. Although <br /> locations of these instruments vary, one is located on quarry property while others are located <br /> off site. The U.S. Department of the Interior, Bureau of Mines Reports of Investigations, RI 8506 <br /> 3-27 <br /> „ <br />
The URL can be used to link to this page
Your browser does not support the video tag.