Browse
Search
Agenda - 10-14-1993 - D 1 attch
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 10-14-1993
>
Agenda - 10-14-1993 - D 1 attch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 11:09:59 AM
Creation date
2/7/2017 11:02:16 AM
Metadata
Fields
Template:
BOCC
Date
10/14/1993
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit No. NCG020000 <br /> PART II <br /> STANDARD CONDITIONS FOR NPDES STORMWATER GENERAL PERMITS <br /> SECTION A. DEFJNITIONS <br /> 1 . Act or "the Act" or CWA <br /> The Federal Water Pollution Control Act, also known as the Clean Water Act, as amended, <br /> 33 USC 1251, et. seq. <br /> 2. Best Management Practices (BMPs' <br /> Schedules of activities, prohibitions of practices, maintenance procedures, and other <br /> management practices to prevent or reduce the pollution of waters of the United States. <br /> BMPs also include treatment requirements, operation procedures, and practices to <br /> control plant site runoff, spillage or leaks, sludge or waste disposal, or drainage from <br /> raw material storage. <br /> 3. Calculation of Means <br /> a. Arithmetic Mean: The arithmetic mean of any set of values is the summation of the <br /> individual values divided by the number of individual values. <br /> b. Geometric Mean: The geometric mean of any set of values is the Nth root of the product of <br /> the individual values where N is equal to the number of individual values. The geometric <br /> mean is equivalent to the antilog of the arithmetic mean of the logarithms of the <br /> individual values. For purposes of calculating the geometric mean, values of zero (0) <br /> shall be considered to be one (I). <br /> c. Weighted by Flow Value: Weighted flow divided vided b means <br /> the summation of the of flows. <br /> concentration times its respective f Y <br /> 4. Bulk Storage of Liquid Products <br /> Liquid raw materials, manufactured products, waste materials or by-products with a <br /> single above ground storage container having a capacity of greater than 660 gallons or <br /> with multiple above ground storage containers having a total storage capacity of greater <br /> than 1,320 gallons. <br /> 5. Calendar Day <br /> The period from midnight of one day until midnight of the next day. However, for <br /> purposes of this permit, any consecutive 24-hour period that reasonably represents the <br /> calendar day may be used for sampling. <br /> 6. Coal Pile Runoff <br /> The rainfall runoff from or through any coal storage pile. <br /> Page 7 of 24 Pages <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.