Orange County NC Website
Permit No. NCG020000 <br /> Section C: Schedule of Compliance <br /> 1 . The permittee shall comply with Final Limitations and Controls specified for stormwater <br /> discharges in accordance with the following schedule: <br /> For the vehicle maintenance activities: <br /> a. Develop and implement BMP's and stormwater controls, as appropriate within the <br /> first 12 months of permit coverage, at existing operations. <br /> b. Develop and implement BMP's and stormwater controls, as appropriate, prior to <br /> beginning mining operations at new operations. <br /> For the land disturbance activities: <br /> a. Implement BMP's and stormwater controls, as appropriate on the effective date of <br /> permit coverage, at existing operations. <br /> b. Develop and implement BMP's and stormwater controls, as appropriate, prior to <br /> beginning land disturbance activity at new operations. <br /> 2. Permittee shall at all times provide the operation and maintenance necessary to operate the perm <br /> stormwater controls at optimum efficiency. <br /> Page 6 of 24 Pages <br />