Browse
Search
Agenda - 10-14-1993 - D 1 attch
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 10-14-1993
>
Agenda - 10-14-1993 - D 1 attch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 11:09:59 AM
Creation date
2/7/2017 11:02:16 AM
Metadata
Fields
Template:
BOCC
Date
10/14/1993
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Monitoring Requirements - Vehicle Maintenance Activities. <br /> Stormwater discharges from any vehicle maintenance activity occurring on-site which uses more than 55 gallons of new motor oil per month when <br /> averaged over the calendar year shall be monitored by the permittee as specified below: <br /> Stormwater Discharge Units Monitoring- Requirements <br /> Characteristics_ Measurement Sample Sample <br /> Freguencvt IYRQ Location <br /> Total Flow3 MG 3/term SDO <br /> Oil and Grease mg/I 3 1term Grab SDO <br /> Lead, Total Recoverable4 ug/I 3 1term Grab SDO <br /> Detergents (MBAS)5 mg/I 3/term Grab SDO <br /> pH Standard 3/term Grab SDO <br /> New motor oil usage gallons/month 3/term Estimate <br /> a Measurement Frequency - 3/term - shall mean Stormwater runoff associated with vehicle maintenance activity on-site. Existing facilities shall be <br /> sampled once within six months of certificate of coverage issuance and, where possible, prior to implementing BMPs and development of the BMP Plan <br /> ,p at existing operations. Thereafter, sampling shall be conducted two times during the remaining permit term at intervals of greater than eighteen <br /> o months apart and collected during the months of April through November. <br /> 2 Sample Locations: SDO - Stormwater Discharge Outfall <br /> ro <br /> to 3 Total flow shall be measured continuously or calculated based on the amount of area draining to the outfall, the amount of built-upon area, and the total <br /> N amount of rainfall or estimated by the measurement of the flow at 20 minute intervals during the rainfall event. Total precipitation and duration of the <br /> event measured shall be a representative storm event. <br /> 4 Applies only for facilities at which fueling occurs. <br /> 5Detergent monitoring is required only at facilities which conduct vehicle cleaning operations. <br /> ro <br /> M <br /> Storm Event Units Monitoring Requirements <br /> Qharacteristic rt <br /> Total Event Precipitation inches 3/term <br /> Event Duration hours 3/term •° <br /> H <br /> n^ <br /> Ul <br /> O <br /> N <br /> O <br /> O <br /> O <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.