Orange County NC Website
This Agreement represents the entire and integrated <br />agreement between the Owner and the CM and supercedes all <br />prior negotiations, representations or agreements, either <br />written or oral. This Agreement may be modified or amended <br />only by written directives, change orders and other instruments <br />signed by the Owner and the CM as expressly set forth in the <br />Agreement. Nothing contained in this Agreement is intended to <br />benefit any third party. The Contractors and Designer are not <br />intended third party beneficiaries of this Agreement. <br />11.6 Severability <br />If any provision of this Agreement is held as a matter of law to <br />be unenforceable, the remainder of this Agreement shall be <br />enforceable without such provision. <br />11.7 Meaning of Terms <br />References made in the singular shall include the plural and <br />the masculine shall include the feminine or neuter. To the <br />greatest extent possible, the meaning of terms used herein <br />shall be consistent with the definitions expressed in the <br />Contract Documents, Designer agreement, and the Contractor <br />contracts. <br />11.8 Notices <br />Whenever any provision of the Contract Documents requires <br />the giving of written notice, it shall be deemed to have been <br />validly given if delivered in person to the individual or to a <br />member of the firm or to an officer of the corporation for whom <br />it is intended or if delivered or sent by registered or certified <br />mail, postage prepaid, addressed as follows: <br />To the Owner: <br />Orange County, North Carolina <br />Attn: Pam Jones, Director of Purchasing and Central Services <br />Post Office Box 8181 <br />Hillsborough, North Carolina 27278 <br />To the CM: <br />Telesis Construction Management, LLC <br />Attn: George A. Horton, III, MemberJManager <br />1000 Corporate Drive, Suite 109 <br />Hillsborough, North Carolina 27278 <br />11.9 Bonds <br />In accordance with N.C. Gen. Stat. §143-128.1, the CM shall <br />provide a performance bond with a penal sum equal to 100% of <br />the Guaranteed Maximum Price to guarantee the faithful <br />performance of the Work, in such form as may be required by <br />law and approved by the Owner. <br />In accordance with N.C. Gen. Stat. §143-128.1, the CM shall <br />provide a payment bond with a penal sum equal to 100°l0 of the <br />Guaranteed Maximum Price to guarantee the payment of all <br />labor and material costs or claims in connection with <br />compliance with the Contract, in such form as may be required <br />bylaw and approved by the Owner. <br />These bonds shall be dated the same date as the Agreement <br />and must be accompanied by a current copy of the power of <br />attorney for the attorney-in-fact executing such bond on behalf <br />of a surety company licensed to do business in the state of <br />North Carolina and reasonably acceptable to the Owner. <br />In its Guaranteed Maximum Price, the CM shall include a <br />program and costs for bonds or other security against default <br />by Gontractors as the GM deems appropriate to protect the GM <br />and the Owner against such defaults. <br />11.10 Ownership of Documents <br />The CM shall be entitled to maintain possession of a <br />reasonable number of sets of Contract Documents and record <br />documents during and after the completion of the Project for its <br />records. After completion of the Project, the CM shall destroy <br />or return to the Owner all other copies of such documents as <br />requested by the Owner. The GM shall not reproduce or <br />distribute such documents to any third person or for any <br />purpose other than bidding, permitting and construction of the <br />Project. The GM shall have no copyright or other rights in the <br />documents, or other rights to use the documents. <br />ARTICLE 12 <br />SPECIAL GUARANTEED MAXIMUM PRICE PROVISIONS <br />12.1 Guaranteed Maximum Price <br />Pursuant to this Agreement and for the Project defined in <br />Article 2, the Owner and the CM have seta Guaranteed <br />Maximum Price for the Project of an amount not to exceed <br />12.1.1. Documentation <br />The Guaranteed Maximum Price documentation shall be <br />prepared by the CM and submitted to the Owner with the <br />Guaranteed Maximum Price Proposal. The documentation <br />27 <br />