2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-012 Purchasing - Resolution Telesis Construction Management County Campus Office Building and Library
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20070626
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
RES-2007-051 Resolution agreements for Construction of & Sale & Purchase County Campus Office Building & Library
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The CM agrees to perform all tasks and functions reasonably <br />necessary to complete the services described in the preceding <br />paragraphs in this Article 3, even if not explicitly described <br />therein, unless the tasks or functions are explicitly described as <br />Additional Services in this section 3.12. At the request of the <br />Owner, the CM shall pertorm Additional Services and shall be <br />compensated for same as provided in Article 7 of this <br />Agreement. The CM shall perform Additional Services only <br />after the Owner and CM have executed a written amendment <br />to this Agreement providing for such services. The following is <br />a list of Services that might reasonably be anticipated, with <br />indication of whether the specified services will be considered <br />to be Additional Services or required Services: <br />3.12.1 Services related to investigation, appraisal, or evaluation <br />of existing conditions, facilities, or equipment or determination <br />of the accuracy of existing drawings or other information <br />furnished by the Owner are required and are not Additional <br />Services; <br />3.12.2 Services related to procurement, storage, maintenance <br />and installation of Owner-furnished equipment, materials, <br />supplies and furnishings are Additional Services; provided, <br />however, that coordination and scheduling of the procurement, <br />storage, maintenance and installation of Owner-furnished <br />equipment, materials, supplies and furnishings with the Work of <br />the Contractors is required and is not an Additional Service; <br />3.12.3 Services related to determination of space needs, <br />programming, internal traffic studies or other utilization of the <br />Project are Additional Services; <br />3.12.4 Warranty inspections during the warranty period of the <br />Project are required and are not Additional Services; <br />3.12.5 Services made necessary by the failure to perform by or <br />bankruptcy of a Contractor is a required Service and is not an <br />Additional Service; <br />3.12.6 Preparation for and serving as a witness in connection <br />with any public or private hearing or arbitration mediation or <br />legal proceeding relating to the Project is a required Service <br />and is not an Additional Service; <br />3.12.7 Assisting the Owner in public relations activities and <br />preparing information for and attending public meetings is a <br />required Service, not an Additional Service; and <br />3.12.8 Services related to move-in including preparing and <br />soliciting responses to requests for proposals, preparing and <br />coordinating the execution of contracts, conducting pre-moving <br />conferences, administering the contract for moving activities in <br />conjunction with the move-in for the Project and providing on- <br />site personnel to oversee the relocation of furniture and <br />equipment by the movers while actual move-in is in progress <br />are Additional Services; provided, however, that coordination of <br />the Work of the Contractors with move-in by the Owner in <br />accordance with the Master Schedule is required and is not an <br />Additional Service. <br />ARTICLE 4 <br />TIME FOR PERFORMANCE <br />4.1 Duration <br />The commencement date for the CM's Services shall be the <br />date of execution of this Agreement by the Owner as stated <br />herein or the date on which the Owner issues to the CM a <br />written instruction to proceed with Services, whichever is <br />earlier. The duration of the CM's Services under this <br />Agreement shall be from the date of this Agreement through <br />the issuance of the certificate of final completion, plus the one- <br />year CM warranty phase services. <br />4.2 Master Schedule <br />The CM's Services shall 6e pertormed for the periods of time <br />indicated in the approved Master Schedule. Firm dates for <br />substantial completion and final completion of the Project shall <br />also be fixed. At that time the CM represents that the Master <br />Schedule has been reviewed in detail, that the Contractors <br />participated in its preparation, that all of the activities which <br />impact, limit, or otherwise affect the time of completion of the <br />Work are shown in the Master Schedule and that all of the <br />activities of others which impact, limit, or otherwise affect the <br />start, duration, or completion of the GM's activities are also <br />shown. The CM further represents that the CM can and will <br />complete each activity within the time shown for that activity. <br />Time is of the essence with respect to each such activity and <br />completion date. <br />4.3 Non-waiver <br />If the CM submits a construction schedule, progress report, or <br />any other document that indicates or otherwise expresses an <br />15 <br />