Browse
Search
Agenda - 06-26-2007-4dd
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-26-2007
>
Agenda - 06-26-2007-4dd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:42:47 PM
Creation date
8/29/2008 8:58:27 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Document Type
Agenda
Agenda Item
4dd
Document Relationships
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-012 Purchasing - Resolution Telesis Construction Management County Campus Office Building and Library
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20070626
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
RES-2007-051 Resolution agreements for Construction of & Sale & Purchase County Campus Office Building & Library
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
laws or regulations and North Carolina State Building Code <br />requirements to prevent accident or injury to persons on or <br />about the location of the Work. The CM shall clearly mark or <br />post signs warning of hazards existing, and shall barricade <br />excavations, elevator shafts, stairwells, floor and wall openings <br />and similar hazards. The CM shall protect against damage or <br />injury resulting from falling materials and shall maintain all <br />protective devices and signs throughout the progress of the <br />Work. <br />3.10.15.7 The CM shall, at a minimum, adhere to the rules, <br />regulations and interpretations of the North Carolina <br />Department of Labor relating to Occupational Safety and <br />Health Standards for the Construction Industry. <br />3.10.15.8 As part of the Project Safety Program the CM agrees <br />to implement a Public Hazard Control Plan conforming to the <br />standards set forth in ANSI A10.34-2005R. The Public Hazard <br />Control Plan shall be submitted to the Owner for review and <br />approval before construction begins on the Project. <br />3.10.15.9 The CM shall designate a responsible member of its <br />organization as safety inspector, whose duties shall include <br />accident prevention on the Project. The name of the onsite <br />safety inspector shall be made known to the Project Designer <br />and Owner at the time the Work is started. The CM will provide <br />the Owner with the name of each Contractor's onsite safety <br />officer. <br />3.10.15.10 In the event of emergency affecting the safety of <br />life, the protection of Work, or the safety of adjoining properties, <br />the CM is hereby authorized to act at its own discretion, without <br />further authorization from anyone, to prevent such threatened <br />injury or damage. Any compensation claimed by the GM on <br />account of such action shall be determined as provided for <br />under Article 7 herein. <br />3.10.15.11 If reasonable precautions are inadequate to prevent <br />foreseeable bodily injury or death to persons resulting from a <br />material or substance encountered but not created on the site <br />by the CM or its Contractors, the CM shall, upon recognizing <br />the condition, immediately stop Work in the affected area and <br />report the condition to the Owner and to the Project Designer in <br />writing. The Owner or the Project property owner if different <br />from the Owner shall take responsibility for remediation of the <br />material or substance from the site. If the CM claim's its <br />progress in completing the Project is delayed because of the <br />remediation response to the site, the CM shall file notice and a <br />claim in accordance with this Agreement. <br />3.10.15.12 Any land-disturbing activity performed by the CM in <br />connection with the Project shall comply with all erosion control <br />measures set forth in the Contract Documents and any <br />additional measures which may be required in order to ensure <br />that the Project is in full compliance with the Sedimentation <br />Pollution Control Act of 1973, as implemented by Title 15, <br />North Carolina Administrative Code, Chapter 4, Sedimentation <br />Control, Subchapters 4A, 4B and 4C, as amended (15 <br />N.C.A.C. 4A, 4B and 4C). <br />3.11 Post Construction Phase <br />The CM shall provide the following ongoing services in <br />connection with Final Completion of the Work by the <br />Contractors: <br />3.11.1 Record Documents <br />The CM shall coordinate and expedite submittals of information <br />from the Contractors for preparation of record Drawings and <br />Specifications, and shall coordinate and expedite the <br />transmittal of such record documents to the Owner. <br />3.11.2 Organize and Index Operations and Maintenance <br />Materials <br />Prior to final completion of the Project the CM shall compile <br />manufacturers' operations and maintenance manuals, <br />warranties and guarantees and bind such documents in an <br />organized manner. This information shall then 6e provided to <br />the Owner. <br />3.11.3 Occupancy Permit <br />The CM shall assist the Owner and Designer in obtaining an <br />occupancy permit by accompanying governmental officials <br />during inspections of the Project, preparing and submitting <br />documentation to governmental agencies and coordinating final <br />testing and other activities. <br />3.11.4 Occupancy Plan <br />The CM, in consultation with the Owner, the Designer and <br />appropriate regulatory agencies, shall prepare an Occupancy <br />Plan for the Project. This plan shall be provided to the Owner <br />at least thirty days prior to Substantial Completion. <br />3.12 Additional Services <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.