Browse
Search
Agenda - 06-26-2007-4dd
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-26-2007
>
Agenda - 06-26-2007-4dd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:42:47 PM
Creation date
8/29/2008 8:58:27 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Document Type
Agenda
Agenda Item
4dd
Document Relationships
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-012 Purchasing - Resolution Telesis Construction Management County Campus Office Building and Library
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20070626
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
RES-2007-051 Resolution agreements for Construction of & Sale & Purchase County Campus Office Building & Library
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
management, and the available resources, and divide the Work <br />for the best benefit of the Project. The CM and the Designer <br />shall collaborate on the preparation of bid documents <br />consistent with the bid packages identified by the CM and <br />approved by the Owner. Consistent with State law, one (single <br />prime bidding) or more (multi prime bidding) bid packages shall <br />be prepared as appropriate for each of the general <br />construction, electrical, mechanical, fire protection, and <br />plumbing divisions of the Work of the Project. The CM shall <br />prepare any other contract packages for other divisions or <br />subdivisions of the Work as agreed with the Owner. The form <br />of agreement and general conditions for inclusion in all bid <br />packages and use in the contracts between the CM and the <br />Contractors for construction for the Project shall be based on a <br />form of Agreement selected by the CM and the General <br />Conditions of the Orange County Contract For Construction - <br />Construction Manager at Risk. The form of Agreement selected <br />by the CM shall be consistent with the Orange County General <br />Conditions of the Contract For Construction -Construction <br />Management at Risk. The requirements of this Agreement <br />shall be included in each construction contract to the extent <br />applicable to the construction contract. Supplementary <br />General Conditions for Contractors shall be prepared by the <br />GM and submitted to the Owner and the Designer with <br />adequate time for review and comment before inclusion in bid <br />packages. The Designer and the CM will collaborate on the <br />preparation of the general Division One requirements of the <br />Specifications. Separate General Conditions for materials and <br />equipment procurement shall be prepared by the CM to meet <br />the specific requirements of the Project using forms approved <br />6y the Owner. The CM shall be afforded a reasonable <br />opportunity to review and comment on all special warranties <br />and other obligations imposed on the Contractors by the <br />Specifications. <br />3.8.9 Public Relations <br />The CM shall assist the Owner in public relations activities and <br />shall prepare information for and attend public meetings <br />regarding the Project as reasonably required by the Owner. <br />3.8.10 Protect Funding <br />The GM shall assist the Owner in preparing documents <br />concerning the Project for use in obtaining or reporting on <br />project funding. The documents shall be prepared in a form <br />approved by the Owner. <br />3.9 Procurement Phase <br />All construction contracts, labor, materials and services shall be <br />procured in accordance with N.C. Gen. Stat. § 143-128.1 and <br />other sections of Chapter 143 Article 8 of the North Carolina <br />General Statutes relating to construction management at risk <br />contracts. <br />3.9.1 Pregualifying Bidders <br />The CM shall develop lists of possible bidders and shall <br />prequalify bidders. This service shall include the following: <br />preparation and transmission of questionnaires; receiving and <br />analyzing completed questionnaires; interviewing possible <br />bidders, bonding agents, and financial institutions; and <br />preparing summary reports regarding this activity to the Owner. <br />The CM shall also prepare and transmit to the Owner a bidders <br />list for each bid package. The Owner shall notify the CM <br />promptly of any reasonable objections to a proposed bidder, <br />and the CM shall remove that bidder from the bidders list. <br />3.9.2 Bidder's Interest Campaign <br />[Not used] <br />3.9.3 Notices and Advertisements <br />The CM shall prepare and place notices and advertisements to <br />solicit competitive bids for the Project. <br />3.9.4 Deliverv of Bid Documents <br />The CM shalt expedite the delivery of bid documents to the <br />bidders. The CM shall obtain a full set of documents from the <br />Designer and arrange for printing, binding, wrapping and <br />delivery to the bidders. The CM shall maintain a record of <br />bidders receiving documents. <br />3.9.5 Pre-Bid Conference <br />In conjunction with the Designer, the CM shall conduct aPre- <br />Bid Conference. These conferences shall be forums for the <br />CM and Designer to explain to the bidders the Project <br />requirements, including information concerning schedule <br />requirements, time and cost control requirements, access <br />requirements, contractor interfaces, minority and women's <br />business enterprise goals, the project administrative <br />requirements and technical information. <br />3.9.6 Information to Bidders <br />The CM shall develop and coordinate procedures to provide <br />answers to bidders' questions. <br />3.9.7 Addenda <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.