[Not used] <br />3.6.7 Estimates for Addenda <br />Prior to bidding, the GM shall notify the Owner and the <br />Designer if any addendum issued by the Designer could impact <br />the Cost of the Work of the Project, and will prepare an <br />estimate of costs for all such addenda and shall submit the <br />estimates to the Owner for approval. After approval by the <br />Owner, addenda shall be transmitted to bidders by the CM. <br />Once bids are received and contracts are awarded to each <br />Contractor, any addenda issued by the Designer which affects <br />a Contractor shall be processed through the change order <br />provisions in the Agreement. <br />3.6.8 Analvzing Bids: Upon receipt of bids, the CM shall <br />evaluate the bids, including alternate prices and unit prices, <br />and before award of any construction contract shall provide the <br />Owner and the Designer with a report summarizing the bids. <br />3.6.9 Schedule of Values (Each Contract) <br />The CM shall, in participation with the Contractors, determine a <br />Schedule of Values for each of the construction contracts. The <br />Schedule of Values shall be the basis for the allocation of the <br />Construction Contract price to the activities shown on the <br />Contractor's Construction Schedule. <br />3.6.10 Allocation of Costs to Contractor's Construction <br />Schedule <br />[Not used] <br />3.6.11 Change Order Control <br />The GM shall establish and implement a change order control <br />system. <br />3.6.11.1 All proposed Owner-initiated change orders shall first <br />be described in detail in writing by the Owner, or the Designer if <br />so requested by the Owner, and forwarded to the GM. The CM <br />shall then forward a request for proposal to the appropriate <br />Contractor (or Contractors), accompanied by technical <br />Drawings and Specifications prepared by the Designer. In <br />response to the request for a proposal, the Contractor shall <br />submit to the CM for evaluation detailed information concerning <br />the costs and time adjustments, if any, necessary to perform <br />the proposed change order work. The CM shall review the <br />Contractor's proposal, shall discuss the proposed change order <br />with the Contractor and determine the Contractor's basis for the <br />cost and time to perform the Work and, as applicable, the <br />effect, if any, on the Guaranteed Maximum Price. The CM <br />shall present its findings to the Owner and Designer. Following <br />Owner acceptance, the Designer shall prepare the change <br />order documents for signature by the GM and Owner. Upon <br />execution of the change order documents between the GM and <br />Owner, the CM shall prepare change order documents for <br />signature by the affected Contractor(s). The CM shall verify <br />that any adjustment of time required by approved change <br />orders has been incorporated into the Contractor's <br />Construction Schedule. <br />3.6.11.2 The CM shall review the contents of all Contractor- <br />requested changes to the contract time or price, determine <br />whether an adjustment to the Guaranteed Maximum Price or <br />the Master Schedule is warranted under the Contract, and <br />determine the amount or length, if any, of the allowable <br />adjustment to the Guaranteed Maximum Price and the Master <br />Schedule. If the CM believes that an adjustment to this <br />Contract might be warranted by a Contractor change request, <br />the CM shall provide the Designer with a copy of the change <br />request, and the CM shall, in its evaluations of the Contractor's <br />request, consider the Designer's comments regarding the <br />proposed changes. The CM shall present its findings to the <br />Owner and Designer regarding the proposed changes. If, after <br />review by the Owner and Designer, the Owner determines that <br />an adjustment to the Guaranteed Maximum Price or Master <br />Schedule is warranted, the Designer shalt prepare the change <br />order documents for signature by the CM, the Owner and the <br />Designer. Upon execution of the change order documents <br />between the CM and Owner, the CM shall prepare change <br />order documents for signature bythe affected Contractor. <br />3.6.11.3 In instances where a lump sum or unit price is not <br />authorized by the Owner in a change order prior to performing <br />Work described in a request for proposal as provided in <br />Paragraph 3.5.11, the CM shall request from the Contractor <br />records of the cost of payroll, materials and equipment and the <br />amount of payments to subcontractors incurred by the <br />Contractor in performing the Work. <br />3.6.12 Trade-Off Studies <br />[Not used] <br />3.6.13 Progress Payments <br />In consultation with the Designer, the CM shall inspect the work <br />to determine compliance with the Contract Documents, review <br />the monthly payment applications submitted by each <br />7 <br />