Browse
Search
Agenda - 06-26-2007-4dd
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-26-2007
>
Agenda - 06-26-2007-4dd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:42:47 PM
Creation date
8/29/2008 8:58:27 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Document Type
Agenda
Agenda Item
4dd
Document Relationships
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-012 Purchasing - Resolution Telesis Construction Management County Campus Office Building and Library
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20070626
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
RES-2007-051 Resolution agreements for Construction of & Sale & Purchase County Campus Office Building & Library
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE <br />COUNTY AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES <br />NORTH <br />CAROLINA <br />This AGREEMENT is made and effective on this date: <br />BETWEEN The Owner: <br />ORANGE COUNTY <br />And the Construction Manager {hereinafter referred to as the "CM"): <br />TELESIS CONSTRUCTION MANAGEMENT, LLC <br />For services in connection with the Project known as: <br />The Orange County two story Public Library and three story Office Building located an Margaret Lane in <br />Hillsborough, North Carolina, as further described in Article 2 <br />For which the Designer is: <br />Brockwell Associates, Inc., in conjunction with Gardner & McDaniel, PA, Engineered Designs, Inc. and <br />Summit Consulting Engineers, PLLC, as sub-consultant to Brockwell Associates, Inc.; AND Phillip K. Barton, <br />Library interior space planner. <br />The Owner and CM, in consideration of their mutual covenants herein, agree asset forth below: <br />TABLE OF CONTENTS <br />ARTICLE 1 -RELATIONSHIP OF THE PARTIES ......................................................................................... 4 <br />1.1 Owner and Construction Manaaer <br />1.2 Owner and Desiqner <br />1.3 GM and Contractors <br />1.4 Relationship of the CM to the Desiqner <br />ARTICLE 2 -PROJECT DEFINITION .......................................................................................................... 4 <br />ARTICLE 3-CONSTRUCTION MANAGER'S SERVICES ................................................................................ 4 <br />3.1 CM Services <br />3.2 CM Personnel <br />3.3 Construction Management Plan <br />3.4 Consultant Selection <br />3.5 Time Management <br />3.6 Cost Management <br />3.7 _Management information 5ystem (MIST <br />3.8 Design Phase Services <br />3.9 Procurement Phase <br />
The URL can be used to link to this page
Your browser does not support the video tag.