the same person. At any time, the CM, in its sole and absolute discretion, may require the <br />Contractor to replace the Project Manager or Resident Superintendent with an experienced <br />and competent person or persons upon seven (7) days written notice from the CM to the <br />Contractor. Such replacement shall be at the Contractor's expense and at no cost to the <br />CM. <br />Both the Project Manager and the Resident Superintendent shall have authority to act on <br />behalf of the Contractor, and instructions, directions or notices given to either of them shall <br />be as binding as if given to the Contractor. <br />7.3 The Contractor shall provide sufficient competent and suitably qualified personnel, <br />equipment, and supplies to lay out the Work and perform construction as required by the <br />Contract Documents. The Contractor will at all times maintain good discipline and order at <br />the site, and will comply with all applicable OSHA standards. <br />Any person employed by the Contractor, by any Subcontractor, or by any sub- <br />subcontractor who, in the opinion of the CM, the Designer or the Owner, does not perform <br />its Work in a proper and skillful manner or is intemperate or disorderly shall, at the written <br />request of the CM, be removed forthwith by the Contractor, Subcontractor, or sub- <br />subcontractor employing such person without cost to the CM, and shall not be employed <br />again in any portion of the Work without the prior written approval of the CM. <br />Should the Contractor fail to remove such person or persons or fail to furnish suitable and <br />sufficient personnel for the proper prosecution of the Work within three (3) days after <br />written order, the CM may withhold further payment by written notice until compliance with <br />such order. <br />7.4 If, in the opinion of the CM, the Designer or the Owner, any Subcontractor on the Project is <br />incompetent or otherwise unsatisfactory, such Subcontractor shall be replaced by the <br />Contractor with no increase in the Contract Price if and when directed by the CM in writing. <br />7.5 The Contractor shall furnish all materials, equipment, labor, transportation, construction <br />equipment and machinery, tools appliances, fuel, light, heat, and all other facilities and <br />incidentals necessary for the execution, maintenance, initial operation, and completion of <br />the Work, other than those specifically excluded by the Contract Documents and to be <br />furnished by the CM or others. When use or storage of hazardous materials or equipment <br />or methods of more than ordinary risk are necessary in accomplishing the Work, the <br />Contractor shall give the CM reasonable advance notice. <br />If any materials are to be furnished or installed by the CM or others under the terms of the <br />Contract Documents, said materials shall be made available to the Contractor at the <br />location(s) specified in the Contract Documents. All costs of handling, transportation from <br />the specified location to the Project, storage, and installing of materials furnished by others <br />shall be included in the Contract Price. The Contractor shall be responsible for any <br />demurrage, damage, loss, or other deficiencies which may occur during the Contractor's <br />handling, storage, or use of material furnished by others. The CM shall deduct from any <br />monies due or to become due the Contractor any cost incurred by the CM in making good <br />any such damage, loss, or deficiency. <br />All equipment which is proposed to be used in the Work shall be of sufficient size and in <br />such mechanical condition as to meet the requirements of the Work and produce a <br />satisfactory quality of work. Equipment used on any portion of the Work shall be such that <br />no injury to previously completed Work, adjacent property, or existing facilities shall result <br />from its use. <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 18 of 43 JUNE 2007 EDITION <br />