Browse
Search
Agenda - 06-26-2007-4dd
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-26-2007
>
Agenda - 06-26-2007-4dd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:42:47 PM
Creation date
8/29/2008 8:58:27 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Document Type
Agenda
Agenda Item
4dd
Document Relationships
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-012 Purchasing - Resolution Telesis Construction Management County Campus Office Building and Library
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20070626
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
RES-2007-051 Resolution agreements for Construction of & Sale & Purchase County Campus Office Building & Library
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provisions of this paragraph 5.4. The indemnification obligations under this paragraph 5.4 <br />shall not be limited in any way by the amount or type of damages, compensation or <br />benefits payable under worker's compensation acts, disability benefit acts, other <br />employment benefit acts, or the amount of insurance carried or recovered. <br />The CM acknowledges that hazardous or toxic waste, material, chemicals, compounds or <br />substances, or other environmental hazards, contamination or pollution, (referred to <br />hereinafter as "environmental hazards") may be present at the Project site that were not <br />created, generated, or released at the Project site by the Contractor or its Subcontractors, <br />agents or employees, acting alone or in concert with others. Unless the remediation, <br />abatement or handling of such environmental hazards is part of the scope of the Work <br />under this Agreement, then upon the discovery of such environmental hazards, the <br />Contractor shall immediately, and in no event more than three days after such discovery, <br />give notice to the CM of the environmental hazards before they are disturbed. The CM, the <br />Owner and the Designer shall thereupon promptly investigate the environmental hazards, <br />and make such changes in the Drawings and/or Specifications as they may find necessary <br />to abate, remediate, isolate or handle the environmental hazards. Any increase or <br />decrease in the Contract Price or the Contract Time resulting from such changes shall be <br />adjusted in the manner provided herein for adjustments as to extra and/or additional Work <br />and changes. It is agreed that the Contractor shall have no liability under this Agreement <br />for any environmental hazards existing at, on or in the Project site prior to the date that <br />Work commences under this Agreement unless the Contractor or its Subcontractors, <br />agents or employees, acting alone or in concert with others, by their own negligence or <br />misconduct, release or expose the Owner or third parties to the environmental hazards. <br />The provisions of this paragraph 5.4 shall survive the termination or cancellation or <br />completion of this Agreement. <br />ARTICLE 6. OTHER RECORD DOCUMENTS AND SUBMITTALS <br />6.1 The CM shall furnish to the Contractor the number of copies of Drawings and Specifications <br />stated in the Supplementary Conditions. Additional copies of Drawings and Specifications <br />may be obtained at the cost of reproduction and handling. <br />6.2 The Contractor shall submit to the CM for fonrvarding to the Designer all Submittals required <br />by the Contract Documents. The Contractor shall submit four (4) reproducible prints of all <br />shop drawings plus the number of copies sufficient for its requirements. The Contractor <br />shall submit samples in quantities required by the Contract Documents. The Contractor <br />shall submit product data in five (5) copies, plus the number of copies sufficient for the <br />Contractor's requirements. All shop drawings shall be reviewed by the Contractor and shall <br />bear the Contractor's stamp of approval before being forwarded to the CM and the <br />Designer. Submittals shall be submitted in such time as to cause no delay to the Work or <br />any part thereof and in accordance with the Contractor's Construction Schedule and <br />Submittal Register. The CM shall review and process the submittal with reasonable <br />promptness, noting desired corrections, if any. The CM shall retain three (3) copies of the <br />submittal and shall return the balance of the reviewed submittal to the Contractor for action. <br />The Contractor shall furnish any corrected submittal to the CM for forwarding to the <br />Designer. The CM shall retain three {3) copies of the corrected submittal for the records of <br />the CM and the Designer, and will return the balance of the reviewed submittal to the <br />Contractor. <br />Subject to paragraph 6.3 herein, no substitutions will be accepted after the bids have been <br />received. All substitutions prior to the receipt of bids shall be in accordance with the <br />Contract Documents. <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 16 of 43 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.