Browse
Search
Agenda - 06-26-2007-4dd
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-26-2007
>
Agenda - 06-26-2007-4dd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:42:47 PM
Creation date
8/29/2008 8:58:27 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Document Type
Agenda
Agenda Item
4dd
Document Relationships
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-012 Purchasing - Resolution Telesis Construction Management County Campus Office Building and Library
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20070626
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
RES-2007-051 Resolution agreements for Construction of & Sale & Purchase County Campus Office Building & Library
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No subcontracting of waste hauling shall be permitted without prior, written approval of the <br />CM. <br />5.1.3 General Liability <br />This policy must be written on an Occurrence basis, with the following minimum Limits of <br />Liability: <br />General Aggregate per project $2,000,000.00 <br />Products/Completed Operations Aggregate $2,000,000.00 <br />Bodily Injury and Property Damage csl/each occurrence $1,000,000.00 <br />Personal Injury and Advertising Injury $2,000,000.00 <br />The policy of insurance shall contain or be endorsed to include the following: <br />a) Blanket Contractual Liability covering Contractor's indemnification obligations <br />under this Agreement, in accordance with ISO policy form CG 00 01. Modifications <br />to the standard provision will not be acceptable if they serve to reduce coverage. <br />b) PremiseslOperations Liability. <br />c) Explosion, collapse, and underground fault. <br />d) Independent Contractors and Independent Subcontractors coverage. <br />e) Broad Form Property Damage. <br />f} Personallnjury. <br />g) Cross Liability/Severability of Interest clause. <br />h) Employer's Stop-Gap Liability endorsement, if applicable. <br />i) Amendment of the Pollution Exclusion Endorsement to allow coverage for bodily <br />injury or property damage caused by heat, smoke, or fumes from a hostile fire. <br />j} Designated General Aggregate Limit Endorsement if required by the <br />Supplementary Conditions. <br />k) For contractors with design responsibility, endorsement CG22 86 and DIC for <br />contractors' professional is requested. <br />Coverage shall remain continuously in effect and without interruption for at least six (6) <br />years from the date of the Notice of Award and shall include coverage for exposures arising <br />from operations that have been completed. The Contractor shall furnish the CM and each <br />other additional insured listed in the Agreement to whom the Certificates have been issued, <br />evidence satisfactory to the CM of continuation of such insurance at the date of Substantial <br />Completion and each year thereafter. <br />5.1.4 Pollution Legal Liability (PLL} <br />Pollution Legal Liability coverage will be provided if required by the Supplementary <br />Conditions. <br />5.1.5 Professional Liability <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 12 of 43 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.