Browse
Search
Agenda - 06-26-2007-4dd
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-26-2007
>
Agenda - 06-26-2007-4dd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:42:47 PM
Creation date
8/29/2008 8:58:27 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Document Type
Agenda
Agenda Item
4dd
Document Relationships
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-012 Purchasing - Resolution Telesis Construction Management County Campus Office Building and Library
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20070626
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
RES-2007-051 Resolution agreements for Construction of & Sale & Purchase County Campus Office Building & Library
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Construction Method. <br />Construction management at risk contract. (G.S. X143-128(al)(4)). <br />4. Construction Manager at Risk. <br />TCM to contract «~ith the County as provided in G.S. ~ 143-64.31. <br />TCI~I: <br />(1) will provide construction management services for the Project throughout <br />the preconstruction and construction phases, and <br />(2) will guarantee the cost of the Project will not exceed the budgeted Project <br />Cost of $17,939,079.1 <br />This guaranteed Project Cost will be adjusted in the event (1) the County <br />introduces any changes to the scope of the work envisioned by TCM and the <br />design professionals` or (2) TC1VI is delayed in the commencement of <br />construction by reason of the public bid process or by reason of matters <br />reasonably beyond TCM's control. <br />TCM remuneration: retention of private elements and the amount by which the <br />budgeted Project Cost exceeds actual Project Cost incurred. <br />TCM Construction Method. <br />TCM will publically advertise, prequalify and accept bids on a single prime basis <br />from licensed general contractors. <br />TCM and the County will develop mutually agreeable prequalification criteria <br />including, but not limited to: <br />iThis sum to Ue reduced by those portions of the contract balances remaining to <br />be paid to design professionals whose contracts must be assigned to the County pursuant <br />to G.S. X143-64.31. <br />ZThe Project budget contemplates that TCIUI will deliver a shell and the upfitted <br />space, the latter as specified by the County. The Project budget includes an upfit <br />allot--°ance of $3~Ift2 for the office building interior and an upfit allowance of $55/ft2 for <br />the library interior. The Project Cost will be adjusted to the extent the otTice building and <br />library interiors upfit costs exceed the budgeted office building and library interior <br />allowances contained in the guaranteed Project Cost. The interior upfit costs shall be <br />identified in the bid documents and the cost to upfit the interiors shall be identified in the <br />construction bid(s). <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.