Browse
Search
Agenda - 10-14-1993 - C 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 10-14-1993
>
Agenda - 10-14-1993 - C 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 11:15:32 AM
Creation date
2/7/2017 11:01:23 AM
Metadata
Fields
Template:
BOCC
Date
10/14/1993
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
061. <br /> 15 <br /> 11. Church-Caldwell Street <br /> Church-Caldwell Street neighborhood consists of twenty (20) <br /> one and two bedroom apartments of elderly apartments. This <br /> neighborhood was occupied in 1986 . <br /> Proposed improvements work over the five-year period include <br /> landscaping, replacement of interior doors, replacement of <br /> range hoods, replacement of electrical outlets and Section 504 <br /> requirements. <br /> Estimated Cost: $ 23 , 390 <br /> 12 . Oakwood <br /> Oakwood is located in Carrboro and consists of thirty (30) two <br /> and three bedroom size apartments. These apartments were <br /> occupied in 1984 . <br /> Proposed improvements work over the five-year period include <br /> landscaping, replacement of gutter and downspout, exterior <br /> painting, replacement of interior doors, replacement of floor <br /> tile and bathroom renovations. <br /> Estimated Cost: $ 82 , 900 <br /> 13 . Management Improvements <br /> Proposed management improvements over the five-year period <br /> include improvements to accommodate the physically <br /> handicapped, replacement of equipment, architectural and <br /> engineering services, cost of relocation of residents, <br /> maintenance training and workshops, and personnel costs. <br /> Also proposed under management improvements are residents <br /> initiatives activities such as the cost of contracting with <br /> residents to maintain public housing grounds and clean vacant <br /> public housing apartments, and to provide a resident <br /> initiatives coordinator to implement programs and services <br /> given high priority by the public housing residents. <br /> Estimated Cost: $487 , 690 <br />
The URL can be used to link to this page
Your browser does not support the video tag.