Browse
Search
Agenda - 10-14-1993 - C 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 10-14-1993
>
Agenda - 10-14-1993 - C 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 11:15:32 AM
Creation date
2/7/2017 11:01:23 AM
Metadata
Fields
Template:
BOCC
Date
10/14/1993
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
060 <br /> 14 <br /> Proposed improvements include landscaping, replacement of <br /> concrete sidewalks, replacement of drainage pipes, replacement <br /> of window sills, replacement of interior doors, replacement of <br /> vinyl flooring, replacement of kitchen cabinets, replacement <br /> of bathroom tubs and fixtures, replacement of sewage lines and <br /> washer hookups. <br /> Estimated Cost: $204 , 930 <br /> 8 . South Roberson Street <br /> South Roberson neighborhood has fifteen (15) apartments <br /> reserved for elderly citizens. This neighborhood was occupied <br /> in 1972 . <br /> Proposed improvements include replacement of exterior doors, <br /> replacement of vinyl flooring, replacement of kitchen cabinet, <br /> replacement of bathroom fixtures, and replacement of <br /> electrical outlets. <br /> Estimated Cost: $123 , 840 <br /> 9 . Colony Woods West <br /> Colony Woods West neighborhood has thirty (30) units located <br /> in fifteen (15) duplexes. This neighborhood was occupied in <br /> 1981. <br /> Proposed improvements include the replacement of exterior <br /> wooden decking, seal coating asphalt parking lots and <br /> driveways, landscaping, replacement of shingle roofs , <br /> replacement of range hoods, replacement of storm doors, <br /> replacement of bathtubs and fixtures, relocation of water <br /> heaters from crawl spaces and interior painting. <br /> Estimated Cost: $307 , 310 <br /> 10. Eastwood <br /> Eastwood consists of thirty-two (32) two and three bedroom <br /> apartments in a mixed use duplex development. This <br /> neighborhood was occupied in 1986. <br /> Proposed improvements over the five-year period include <br /> replacement of interior doors, replacement of electrical <br /> outlets, installation of washer hookups, bathroom renovations, <br /> and Section 504 requirements. <br /> Estimated Cost: $ 32 , 590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.