Orange County NC Website
05S <br /> 12 <br /> ATTACHMENT 2a <br /> FIVE-YEAR PLAN <br /> PROJECTED COST ESTIMATES FOR PUBLIC HOUSING MODERNIZATION <br /> 1. Crain/Gomains <br /> Craig/Gomains neighborhood has forty (40) units of mixed <br /> bedroom size apartments located on Craig, Gomains, Bynum, <br /> Sykes and Edwards Street. The neighborhood was occupied in <br /> 1967 . <br /> Proposed improvements to this neighborhood include the <br /> abatement of lead based paint, replacement of water heaters, <br /> replacement of sewage and water lines, installation of washer <br /> hook-ups, replacement of bathroom tubs and fixtures, <br /> replacement of floor tiles, replacement of exterior and <br /> interior doors, installation of outlets near sinks with ground <br /> fault outlets and grading and landscaping to eliminate erosion <br /> and bare areas. <br /> Estimated Cost: $ 430 , 300 <br /> 2 . Lindsay Street <br /> Lindsay Street neighborhood has nine (9) apartments located in <br /> three triplexes consisting of two and three bedroom <br /> apartments. This neighborhood was occupied in 1967 . <br /> Proposed improvements to this neighborhood include <br /> landscaping, replacement of doors, flooring, bathroom tubs and <br /> fixtures, installation of outlets near sinks with ground fault <br /> outlets, replacement of plumbing supply lines and sewage <br /> lines, replacement of water heaters and furnaces. <br /> Estimated Cost: $ 105 , 670 <br /> 3 . North Columbia Street <br /> North Columbia Street neighborhood has eleven (11) apartments , <br /> consisting of one and two bedroom size apartments. This <br /> neighborhood was occupied in 1968 . <br /> Proposed improvements to this neighborhood include seal <br /> coating the asphalt parking lot, replacing concrete sidewalks, <br /> enclosing closet openings, and replacement of vinyl flooring, <br /> replacement of bathroom tubs and fixtures, installation of <br /> outlets near sinks with ground fault outlets, replacement of <br /> water heaters and gas furnaces. <br /> Estimated Cost: $ 68 , 750 <br />