Orange County NC Website
DocuSign Envelope ID:2E5F960A-00C2-416D-B3AC-552CB78379FF <br /> • <br /> Notice to Bidders <br /> 6. Advise the OC CPM of any item noticed during the conduct of the work,or prior to commencement that may <br /> cause an interruption to services(such as a power outage,etc.). <br /> 7. Please contact the OC CPM to be sure that all applicable forms(if required)have been completed prior to work <br /> starting—i.e."Hot Work Permit". <br /> 8. Advise the OC CPM of any item noticed during the conduct of the work,or prior to commencement that may <br /> also require repair/rectification(other than what the original scope of work covered). <br /> If you have any questions please email Angel Barnes(Abarnes @orangecountync.gov)and note that all <br /> responses will be sent out via addendum to all bidders.The Orange County Project Manager is the first <br /> point of contact for all questions/concerns/comments.Contractor shall not communicate with clients <br /> during any portion of the work without notifying OC CPM first. <br /> All contractors are hereby notified that they must have a proper license as required under the <br /> NC state laws governing their respective trades. <br /> General contractors are notified that Chapter 87,Article 1, General Statutes of North Carolina, <br /> will be observed in receiving and awarding general contracts. General contractors submitting <br /> bids on this project must have license classification for unlimited commercial construction. <br /> NOTE: Under GS 87-1 and GC Board Rule 21 NCAC 12.0210,a contractor that superintends or <br /> manages construction of any building, highway,public utility,grading,structure or <br /> improvement shall be deemed a"general contractor"and shall be so licensed. Therefore a <br /> single prime project that involves other trades will require the single prime contractor to hold a <br /> proper General Contractors license. EXCEPT,in public building projects when the total general <br /> construction value does not exceed 25%of the total project contracts,then another trade <br /> (P,M,or E) may contract directly with the owner as a single prime and subcontract other trade <br /> work,including general construction,to properly licensed contractors. <br /> Payment will be made based on ninety-five percent(95%)of monthly estimates and final payment made <br /> upon completion and acceptance of work. <br /> No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 <br /> days. <br /> The owner reserves the right to reject any or all bids and to waive informalities. <br /> Designer: Owner: <br /> Statler Gilfillen,Architect Orange County Government <br /> 3302 St.Mary's Road,Hillsborough,NC 200 S Cameron Street,Hillsborough,NC 27278 <br /> (919)732-6123 (919)732-8181 <br />