Browse
Search
2017-055-E AMS - Tibbens Construction to renovate restrooms for single occupancy
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-055-E AMS - Tibbens Construction to renovate restrooms for single occupancy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 3:31:44 PM
Creation date
2/7/2017 8:14:02 AM
Metadata
Fields
Template:
Contract
Date
1/30/2017
Contract Starting Date
1/30/2017
Contract Ending Date
6/30/2017
Contract Document Type
Agreement - Construction
Amount
$78,900.00
Document Relationships
R 2017-055-E AMS - Tibbens Construction to renovate restrooms for single occupancy
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
000vSign Envelope ID:uE5r800A-00Cu-410o'e3AC-5nuCer83r8rr <br /> "���'������� ����� � ���� <br /> V �~���� � ^� <br /> Y,V4: ( ;/'1, 0'4 P]A <br /> Asset Management Services <br /> Single Occupancy Restrooms <br /> Friday,December 30,2016 <br /> Bid Review Meeting <br /> • Jeff Thompson <br /> • Mark Tibbens <br /> • Angel Barnes <br /> • <br /> Low Bid Negation Meeting Minutes <br /> 1. Cedar Grove Community Center:This scope of work has been removed from your scope. <br /> 2. Solid Waste:The scope has been reduced to (4) signs, door lock, closet doors and baby <br /> changing station* This work includes you purchasing and installing the items mentioned. Per <br /> the review in the meeting you will be able to complete this portion of work for$4,600.00 <br /> 3. Animal Services: The scope on this one has changed to only convert the existing men's restroom <br /> into (1) Men's Restroom, and (1) Single Use Facility. As per the meeting you will work with <br /> your contractors to work out the estimate for the cost to perform the new discussed scope. <br /> 4. Rogers Road Community Center: Please work with the plumbing inspector or engineer to <br /> determine if we can tie into existing 4" line that is within the area of work per the as-built <br /> drawings. I have attached a copy of the as-built drawings that I provided to you hard copies <br /> today just in case you need to send them over to someone. Let me know if I need to reach <br /> out to anyone on this to support you in this effort. <br /> * * <br /> P/}. Box 8l81 131 yNa�angLan�3 Floor* Hilisborough,North Carolina 27278 <br /> Telephone:919 245-2625 <br /> Fax:919'644-3001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.