Browse
Search
Agenda - 10-04-1993 - VIII-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 10-04-1993
>
Agenda - 10-04-1993 - VIII-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2017 4:33:48 PM
Creation date
2/6/2017 4:14:45 PM
Metadata
Fields
Template:
BOCC
Date
10/4/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT <br /> ARTICLE 1 schedule or construction budget, the Architect shall prepare, <br /> ARCHITECT'S RESPONSIBILITIES for approval by the Owner, Design Development Documents <br /> consisting of drawings and other documents to fix and describe <br /> 1.1 ARCHITECT'S SERVICES the size and character of the Project as to architectural, struc- <br /> tural, mechanical and electrical systems, materials and such <br /> 1.1.1 The Architect's services consist of those services per- other elements as may be appropriate. <br /> formed by the Architect,Architect's employees and Architect's 2.3.2 The Architect shall advise the Owner of any adjustments <br /> consultants as enumerated in Articles 2 and 3 of this Agreement to the preliminary estimate of Construction Cost. <br /> and any other services included in Article 12. <br /> 1.1.2 The Architect's services shall be performed as expedi- 2.4 CONSTRUCTION DOCUMENTS PHASE <br /> tiously as is consistent with professional skill and care and the <br /> orderly progress of the Work. Upon request of the Owner, the 2.4.1 Based on the approved Design Development Docu <br /> Architect shall submit for the Owner's approval a schedule for menu and any further adjustments in the scope or quality of <br /> the performance of the Architect's services which may be the Project or in the construction budget authorized by the <br /> adjusted as the Project proceeds, and shall include allowances Owner, the Architect shall prepare, for approval by the Owner. <br /> for periods of time required for the Owner's review and for Construction Documents consisting of Drawings and 5pecifica <br /> approval of submissions by authorities having jurisdiction over <br /> tions setting forth in detail the requirements for the construe <br /> the Project. Time limits established by this schedule approved lion of the Project. <br /> by the Owner shall not,except for reasonable cause, be exceeded 2.4.2 The Architect shall assist the Owner in the preparation of <br /> by the Architect or Owner. the necessary bidding information, bidding forms, the Condi- <br /> 1.1.3 The services covered by this Agreement are subject to tions of the Contract, and the form of Agreement between the <br /> the time limitations contained in Subparagraph 11.5.1. Owner and Contractor. <br /> 2.4.3 The Architect shall advise the Owner of any adjustments <br /> ARTICLE 2 to previous preliminary estimates of Construction Cost indi- <br /> cated by changes in requirements or general market conditions. <br /> SCOPE OF ARCHITECT'S BASIC SERVICES <br /> 2.4.4 The Architect shall assist the Owner in connection with <br /> 2.1 DEFINITION the Owner's responsibility for filing documents required for <br /> the approval of governmental authorities having jurisdiction <br /> 2.1.1 The Architect's Basic Services consist of those described over the Project. <br /> in Paragraphs 2.2 through 2.6 and any other services identified <br /> in Article 12 as part of Basic Services,and include normal struc- 2.5 BIDDING OR NEGOTIATION PHASE <br /> tural, mechanical and electrical engineering services. <br /> 2.5.1 The Architect, following the Owner's approval of the <br /> 2.2 SCHEMATIC DESIGN PHASE Construction Documents and of the latest preliminary estimate <br /> 2.2.1 The Architect shall review the program furnished by the of Construction Cost, shall assist the Owner in obtaining bids <br /> Owner to ascertain the requirements of the Project and shall or negotiated proposals and assist in awarding and preparing <br /> arrive at a mutual understanding of such requirements with the contracts for construction. <br /> Owner. <br /> 2.6 CONSTRUCTION PHASE—ADMINISTRATION <br /> 2.2.2 The Architect shall provide a preliminary evaluation of OF THE CONSTRUCTION CONTRACT <br /> the Owner's program, schedule and construction budget <br /> requirements, each in terms of the other, subject to the limita- 2.6.1 The Architect's responsibility to provide Basic Services <br /> tions set forth in Subparagraph 5.2.1. for the Construction Phase under this Agreement commences <br /> with the award of the Contract for Construction and terminates <br /> 2.2.3 The Architect shall review with the Owner alternative at the earlier of the issuance to the Owner of the final Certificate <br /> approaches to design and construction of the Project. for Payment or 60 days after the date of Substantial Completion <br /> 2.2.4 Based on the mutually agreed-upon program, schedule of the Work, unless extended under the terms of Subparagraph <br /> and construction budget requirements, the Architect shall 10.3.3. <br /> prepare, for approval by the Owner, Schematic Design Docu- 2.6.2 The Architect shall provide administration of the Con- <br /> ments consisting of drawings and other documents illustrating tract for Construction as set forth below and in the edition of <br /> the scale and relationship of Project components. AIA Document A201, General Conditions of the Contract for <br /> 2.2.5 The Architect shall submit to the Owner a preliminary Construction, current as of the date of this Agreement, unless <br /> estimate of Construction Cost based on current area,volume or otherwise provided in this Agreement. <br /> other unit costs. 2.6.3 Duties,responsibilities and limitations of authority of the <br /> 2.3 DESIGN DEVELOPMENT PHASE Architect shall not be restricted, modified or extended without <br /> written agreement of the Owner and Architect with consent of <br /> 2.3.1 Based on the approved Schematic Design Documents the Contractor, which consent shall not be unreasonably <br /> and any adjustments authorized by the Owner in the program, withheld. <br /> AIA DOCUMENT 8141 • OWNER-ARCHITECT AGREEMENT• FOURTEENTH EDITION•AIA® • ©1987 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1'35 NEW YORK AVENUE,N.W.,WASHINGTON,D.C.20006 BI41-1987 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.