Browse
Search
Agenda - 06-26-2007-4bb
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-26-2007
>
Agenda - 06-26-2007-4bb
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:44:06 PM
Creation date
8/28/2008 12:02:41 PM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Document Type
Agenda
Agenda Item
4bb
Document Relationships
Minutes - 20070626
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~..SUMMIT <br />Consulting Engineers <br />16. Compressive Strength Grout Prism $ 50.00 ea. <br />17. Compressive Strength Core Specimen $ 50.00 ea. <br />18. Concrete Beam, Modules of Rupture $ 40.00 ea. <br />Asphalt <br />19. Density Cares (ASTM to 2726) $ 35.00 ea <br />C. Miscellaneous <br />20. Overtime <br />Saturdays and excess of 8 hrs. /day Tirne &'/Z <br />Sundays and Holidays Double Time <br />21. Mileage 0.441mi. <br />22. Direct Expenses Cost + 15% <br />23. Coring Equipment _ Coring Gun, Generator $250.00/day <br />Pricing for Additional Tests can be quoted upon request. <br />NOTES: <br />1. Unit prices are in effect for 12 months from date of proposal. <br />2. All rates are billed on aportal=to-portal basis. <br />3. Scheduling of field testing and observation services is required no less than <br />the working day prior to the date the services are to be performed. <br />4. Services cancelled without advance notice will be assessed a minimum 2 hour <br />charge. . <br />5. A minimum charge of 2 hours applies to field testing and observation services. <br />6: For construction materials testing and observation services, an engineering <br />review charge to schedule and supervise personnel and evaluate and review <br />reports will be billed at a minimum of 0.5 hour per report issued. Concrete <br />compression testing will be charged 0.2 hour of review time for a set of <br />cylinders. <br />1 <br />Pare 7• of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.