Browse
Search
Agenda - 06-26-2007-4bb
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-26-2007
>
Agenda - 06-26-2007-4bb
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:44:06 PM
Creation date
8/28/2008 12:02:41 PM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Document Type
Agenda
Agenda Item
4bb
Document Relationships
Minutes - 20070626
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: June 26, 2007 <br />Action Agenda <br />Item No. ~- -~~ <br />SUBJECT: Contract Approval: Construction Materials Testing and Observation Services <br />for Justice Facilities Expansion Project <br />DEPARTMENT: Purchasing and Central PUBLIC HEARING: (Y/N) No <br />Services <br />ATTACHMENT(S): <br />Proposal <br />Contract <br />INFORMATION CONTACT: <br />Pam Jones (919) 245-2652 <br />PURPOSE: To consider approving a contract with Summit Engineering, Hillsborough, North <br />Carolina to perform construction materials testing .and construction observation in conjunction <br />with the Justice Facilities Expansion Project. <br />BACKGROUND: Commencement of construction of the 40,000 square foot addition of the <br />New Courthouse is imminent. In order to ensure independent test results, project owners are <br />generally responsible for retaining a firm to provide materials testing and observations of certain <br />activities during construction. Representative examples of such work include: testing of <br />concrete after it is poured in place to ensure it is of a mix that would provide the stability needed <br />and specified for the building; and observation to ensure proper compaction of soils during the' <br />construction of parking lots. A broader explanation of the scope of services is listed in the <br />attached proposal. <br />Summit Engineering is a local firm that has provided similar services to the County in the past. <br />Summit has proven its ability to provide quality service to the. County on other projects at a <br />reasonable cost. Further, the firm's proximity to this project is a benefit to the County since it <br />would be able to respond quickly and at minimal travel expense to the site as the need arises. <br />This contract exceeds the County's Manager's authorization to approve professional service <br />contracts ($5,000) and is therefore submitted for Board approval. <br />FINANCIAL IMPACT: Estimated expenditures for materials testing and observation of a typical <br />project of this type are $12,000 and are included in the project budget. <br />
The URL can be used to link to this page
Your browser does not support the video tag.