Orange County NC Website
2 <br /> and septic tanks, with the exception of lots 22 and <br /> 25, which shall have easements for sewage disposal <br /> - located on lots 23 and 24 . <br /> The stream that flows northeast across the northern <br /> portion of the subdivision is intermittent; therefore, <br /> a stream buffer is not required. Lots 23 and 24 are <br /> proposed as flag lots with a joint driveway crossing <br /> the stream. Construction of the joint driveway will be <br /> included with the improvements required for final <br /> approval of Phase C. <br /> On September 20, the Planning Board unanimously <br /> recommended approval of the Preliminary Plan. <br /> RECOMMENDATION: The Administration recommends approval of the <br /> Preliminary Plan for Clearview Subdivision with a <br /> public road built to State standards and the <br /> conditions contained in the attached Resolution of <br /> Approval. <br />