Browse
Search
Agenda 09-07-1993 - VII-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 09-07-1993
>
Agenda 09-07-1993 - VII-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2017 3:17:32 PM
Creation date
2/6/2017 2:30:30 PM
Metadata
Fields
Template:
BOCC
Date
9/7/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VII-A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�A6--- 9 74-3 <br /> ORANGE COUNTY PLANNING DEPARTMENT <br /> 306F REVERE ROAD <br /> HILLSBOROUGH, NORTH CAROLINA 27278 <br /> zn <br /> MEMORANDUM - <br /> To: Or ge County Board of Commissioners <br /> From: Ca rter, Transportation Planner II <br /> Subject: Additional Information for Transportation Improvement <br /> Program Consideration <br /> Date: September 7, 1993 <br /> As a result of discussions with the Planning Director, staff has <br /> investigated additional projects for possible inclusion in the <br /> Orange County Transportation Improvement Program priority list. <br /> Staff has investigated transportation improvement needs in the <br /> three proposed Economic Development Districts. It has been <br /> determined that some improvements are desirable in each district in <br /> order that they may efficiently serve targeted development and the <br /> surrounding community transportation needs. Also, these districts <br /> will serve as "entrance-ways" and the recommended improvements will <br /> enhance both the scenic and functional capacities of the roadways. <br /> I-85/Buckhorn Road Economic Development District <br /> 1) Buckhorn Road from I-85 project terminus to US 70 - widening <br /> improvements to same standards as I-85 portion of project (24 ' <br /> pavement on 120 ' right-of-way) which would provide for easy <br /> installation of future turn lanes, grade improvements at Southern i <br /> Railroad Crossing, intersection improvements including turn lanes <br /> and improved turn radii for easier and safer truck turn movements <br /> at US70 . <br /> Old NC 86/I-40 Economic Development District <br /> 1) Old NC 86 - widen to a four lane divided facility from I-40 to <br /> 1-85 . Recommended cross-section would be four 12 ' travel lanes <br /> with a landscaped median. Access should be limited with additional <br /> controls placed on median openings. Bicycle facilities (4 ' paved <br /> shoulders and signage) should also be incorporated with this <br /> project as recommended in the Draft Regional Bicycle Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.