Browse
Search
Agenda 09-07-1993 - III-J
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 09-07-1993
>
Agenda 09-07-1993 - III-J
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2017 3:16:36 PM
Creation date
2/6/2017 2:29:08 PM
Metadata
Fields
Template:
BOCC
Date
9/7/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
III-J
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.0 Locate utility or heating tunnels, electric and telephone utility poles, <br /> underground or overhead service wiring, hydrants, gas, steam, water, piping, <br /> sewage storm drainage, combination drains indicating size of pipe, flow and <br /> pressure. Location of transformers, and current characteristics (overhead or <br /> underground). Elevation of manhole, size and use. Elevation of inverts, <br /> valves, and pipes. <br /> 9.0 Indicate all topographic elevations taken and connect same graphically for the <br /> + 34-acre tract. Contours shall be shown at 2'-0" intervals. <br /> 10.0 Scale to be 1" = 50'-0". <br /> 11.0 Survey drawing file compatible with Autocad Version 11.0. <br /> 13.0 Cross sections into site along site side of Homestead Road shall extend 400' <br /> beyond the end of property line. Cross sections shall begin at center line of <br /> existing roadway and extend into the property. Private driveways shall be <br /> located in plan along Homestead Road. Sections shall be drawn to 1"=50' <br /> horizontal and 1"=5'0" vertical scales. <br /> 15.0 Survey shall be delivered 30 calendar days from notice-to-proceed & <br /> completed cross sections may follow 2-weeks later if necessary. <br /> FEE AMOUNT: $10,500.00 <br /> FEE TYPE: Fixed Fee <br /> Add Alternative 1 North Carolina Grid Tie (horizontal & vertical) $ 700.00 <br /> SPECIAL CONDITIONS: <br /> 1. Underground utilities will be surveyed & shown as field located by their <br /> respective agents. <br /> The Terms and Conditions on the reverse of this form are a part of this Agreement. <br /> This Agreement entered into as of the day and year first written above. <br /> CLIENT 3 J.L\VL OR <br /> (Signature) (Signature) <br /> CHAFR, o ANGE C3UNTY <br /> BOARD OF COMMISSIONERS Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.