Browse
Search
Agenda - 08-23-1993 - C 2 and C 3 attch
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 08-23-1993
>
Agenda - 08-23-1993 - C 2 and C 3 attch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2017 3:15:15 PM
Creation date
2/6/2017 1:55:46 PM
Metadata
Fields
Template:
BOCC
Date
8/23/1993
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C 2 and C 3 attch
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o\ Orange Water and Sewer Authority <br /> 400 Jones Ferry Road <br /> OWASA P.O. Box 366 <br /> Carrboro, NC 27610 <br /> (919) 968-4421 <br /> STATEMENT TO THE ORANGE COUNTY BOARD OF COMMISSIONERS <br /> PUBLIC HEARING ON PROPOSED AMENDMENTS TO THE COUNTY'S <br /> ZONING ORDINANCE AND SUBDIVISION REGULATIONS <br /> REGARDING THE PROTECTION OF WATER SUPPLY WATERSHEDS <br /> Superior Courtroom, Orange County Courthouse <br /> Hillsborough, North Carolina <br /> August 23, 1993 <br /> Orange Water and Sewer Authority's position on the proposed watershed protection requirements <br /> is summarized as follows: <br /> • Strong support and appreciation for strict measures to be left in place for the University <br /> Lake watershed. <br /> • Support for amendments pertaining to the Jordan Lake Protected Area. <br /> • Disagreement with and substantial concern regarding proposals to weaken existing <br /> regulations in the Cane Creek watershed. <br /> The Authority respectfully requests the Board of Commissioners to apply the following interim <br /> regulations to the Cane Creek watershed, pending completion of the comprehensive watershed <br /> study to be conducted for OWASA and subsequent actions taken pursuant to its recommendations. <br /> 1. Continue to prohibit all commercial or industrial land uses throughout the Cane Creek <br /> watershed. <br /> 2. Apply the same minimum lot and impervious surface limits to the entire Cane Creek <br /> Reservoir watershed as proposed for the University Lake watershed, basically 5-acre <br /> minimum lots plus other strong protective measures. <br /> 3. Allow the provision of water and wastewater service only through individual onsite wells <br /> and disposal systems; no municipal or community level wastewater disposal. <br /> There is ample justification for assigning more protective rules to Cane Creek than to other WS-II <br /> watersheds in Orange County. The Cane Creek watershed merits special protection for a number <br /> of very important reasons including: <br /> • Field observations and unreduced monitoring data suggest that water in the Cane Creek <br /> Reservoir may be of substantially lower quality than originally predicted. <br /> An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.