Browse
Search
Agenda - 08-23-1993 - C 2 and C 3 attch
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 08-23-1993
>
Agenda - 08-23-1993 - C 2 and C 3 attch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2017 3:15:15 PM
Creation date
2/6/2017 1:55:46 PM
Metadata
Fields
Template:
BOCC
Date
8/23/1993
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C 2 and C 3 attch
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br /> REFERENCES <br /> BMPs (Best Management Practices) <br /> BMP Handbook for the Occoquan Watershed, Northern Virginia Planning District <br /> Commission, Annandale, Virginia; August, 1987. <br /> Northern Virginia BMP Handbook. Northern Virginia Planning District Commission. <br /> November 6, 1992. <br /> Controlling Urban Runoff: A Practical Manual for Planning and Designing Urban BMPs. <br /> Metropolitan Washington Council of Governments; July, 1987. <br /> Pond Design <br /> U.S. Department of Agriculture Soil Conservation Service guidelines and standards for <br /> pond design and construction. <br /> Stormwater Control and Detention <br /> BMP Handbook for the Occoquan Watershed. Northern Virginia Planning District <br /> Commission, Annandale, Virginia; August, 1987. <br /> Controlling Urban Runoff: A Practical Manual for Planning and Designing Urban BMPs. <br /> Metropolitan Washington Council of Governments; July, 1987. <br /> DRAFT 13 June 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.