Browse
Search
Agenda - 08-23-1993 - C 2 and C 3 attch
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 08-23-1993
>
Agenda - 08-23-1993 - C 2 and C 3 attch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2017 3:15:15 PM
Creation date
2/6/2017 1:55:46 PM
Metadata
Fields
Template:
BOCC
Date
8/23/1993
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C 2 and C 3 attch
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Submission <br /> 14 6 Predevelopment Consultation <br /> Consultation with those reviewing the site plan and pond design are encouraged before <br /> submission of the application for development approval. The purpose is to review the proposal <br /> and discuss how these standards apply to the specific site. It is also an opportunity to answer <br /> questions and attempt to work out any conflicts before submitting a formal application. <br /> Plan Content <br /> At a minimum the plan must include the following: <br /> A topographic map of the pond location and surrounding area (not the entire watershed) <br /> based on a field survey by a registered engineer or surveyor. <br /> Calculations to support the requirements of this standard, assumptions, the design, etc. <br /> including runoff, storage volumes, surface area, pipe and spillway sizing, velocity in <br /> spillway for lining, outlet protection, flood routing, etc. <br /> Plans of the design with pertinent information required to evaluate design and for it to <br /> be built according to the design. <br /> Soils investigation report performed by a qualified individual. <br /> Profile of dam with outlet structure elevations. <br /> Illustrative cross sections of the basin with finished elevations showing areas to be left <br /> shallow to encourage the growth of vegetation or, if part of the design, to be deeper to <br /> discourage growth and provide recreation or other.uses. <br /> Erosion control plan, if applicable, along with application, fees, etc. (Erosion control <br /> should at least be considered in the design, but the actual submission of the plan for <br /> approval will depend on the proposed date for the start of construction.) <br /> Landscaping, stabilization, other pertinent information, such as establishing marsh <br /> vegetation, providing recreation facilities, etc. <br /> DRAFT 12 June 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.