Orange County NC Website
12 5 <br /> or location of the structure. Proposed changes shall be prepared by a North <br /> Carolina registered professional engineer or landscape architect(to the extent that <br /> the General Statutes, Chapter 89A, allow) and submitted to and reviewed by the <br /> Erosion Control Supervisor prior to consideration by the County Engineer. <br /> a. If the County Engineer approves the proposed changes, the owning entity <br /> of the stormwater control structure shall filed sealed copies of the <br /> revisions with the Erosion Control Supervisor. <br /> b. If the County Engineer disapproves the changes, the proposal may be <br /> revised and resubmitted to the Erosion Control Officer as a new <br /> proposal. If the proposal has not been revised and is essentially the same <br /> as that already reviewed, it shall be returned to the applicant. <br /> c. The County Engineer shall report any such revisions to the Board of <br /> County Commissioners at the next available regular meeting. <br /> 6 Major Amendments to Plans and Specifications <br /> Amendments to the plans and specifications of the stormwater control structure <br /> and/or the operation and maintenance plan or manual which involve a change in <br /> the size or location may be approved by the Board of Commissioners after <br /> receiving a recommendation from the County Engineer. Proposed changes shall <br /> be prepared by a North Carolina registered professional engineer or landscape <br /> architect (to the extent that the General Statutes, Chapter 89A, allow) and <br /> submitted to and reviewed by the Erosion Control Supervisor prior to review by <br /> the County Engineer. <br /> 7 Revision of Plan Required if Found to be Inadequate <br /> If the County finds that the operations and maintenance plan or manual is <br /> inadequate for any reason, the owning entity shall be notified of any required <br /> changes and shall prepare and file copies of the revised agreement with the <br /> Orange County Register of Deeds, the Erosion Control Supervisor, and the <br /> owning entity. <br /> c) Inspection and Release of the Performance Bond <br /> 1. Inspection by Erosion Control Supervisor <br /> The stormwater control structure shall be inspected by the Erosion Control <br /> Supervisor, after the owning entity notifies the Erosion Control Supervisor that <br /> all work has been completed. At this inspection, the owning entity shall provide: <br /> a. The signed deed, related easements and survey plat for the stormwater <br /> control structure ready for filing with the Orange County Register of <br /> Deeds; and <br /> 9 <br />