Browse
Search
Agenda - 08-17-1993 - III-D
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 08-17-1993
>
Agenda - 08-17-1993 - III-D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2017 3:10:42 PM
Creation date
2/6/2017 11:17:17 AM
Metadata
Fields
Template:
BOCC
Date
8/17/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
III-D
Document Relationships
Minutes - 19930817
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 11 of 20 <br /> project equipment is not being fully utilized, the Contractor shall transfer <br /> or dispose of the project equipment at the direction ofthe Department. <br /> Failure to carry out the'' requirements set forth in this Section shall <br /> constitute a breach of contract and, after notification by the Department, <br /> may result in termination of the Agreement. In the event of project <br /> termination or breach of contract provisions, the Contractor shall , upon <br /> written notification by the Department, surrender project equipment and/or <br /> transfer the Certificate(s) of Title for project equipment to the Department <br /> or the Department's designee. <br /> Section 12. Maintenance and Inspection. The Contractor shall <br /> maintain all project equipment at a high level of cleanliness, safety, and <br /> mechanical soundness. The Contractor shall register all vehicle <br /> maintenance activities in the Comprehensive Maintenance Record, which is <br /> part of the Preventive Maintenance Guidelines published by the Public <br /> Transportation and Rail Division. The Department shall conduct inspections, <br /> not less than once every two (2) years, to confirm proper maintenance <br /> pursuant to this Section and use in accordance with Section 9 of this , <br /> Agreement. <br /> Section 13. Insurance. The Contractor shall be responsible for <br /> protecting the Federal and State financial interests in project equipment <br /> purchased under this Agreement throughout the useful life of the equipment. <br /> The Contractor shall provide, on an annual basis and in such a manner as the <br /> Department may require, written documentation that all equipment is insured <br /> against loss in an amount equal to or greater than federal and state <br /> percentage of the real value of the equipment. Failure of the Contractor to <br /> provide adequate insurance shall be considered a breach of contract and, <br />
The URL can be used to link to this page
Your browser does not support the video tag.