Browse
Search
Agenda - 08-17-1993 - III-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 08-17-1993
>
Agenda - 08-17-1993 - III-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2017 3:10:19 PM
Creation date
2/6/2017 11:16:30 AM
Metadata
Fields
Template:
BOCC
Date
8/17/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
III-A
Document Relationships
Minutes - 19930817
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> inform them. <br /> September 8 , 1992 . Discussed with Ron Holloway of Environmental <br /> Health. <br /> September 10, 1992 . Billy Walker, Mr. Berini' s engineer, brought <br /> in revised plans . We discussed the site and status with the <br /> county engineer. <br /> September 11 , 1992 . Mr. Berini called about the status of the <br /> application. I explained the need for either him or hiS engineer <br /> to talk with the county engineer and that it was a matter of <br /> waiting to go through the process before the permit could be <br /> approved. <br /> September 21, 1992 . Mr. Berini called again about status . Told <br /> him I had a message from the county engineer but I needed to talk <br /> to him first. <br /> Later I talked with Paul Thames and he said it was O.K. to <br /> proceed. He has concerns about the use of 6" lines but the State <br /> has approved it so there is nothing he can do about it. <br /> September 22 , 1992 . Billy Walker called at Mr. Berini' s request <br /> to see if I needed any more information. I told him no. <br /> Later, I called and left Mr. Berini a message that I would <br /> approve the erosion control plan, and he called to make an ap- <br /> pointment to pick up the permit. <br /> After I approved the plan work commenced and I had no further <br /> contact with Mr. Berini that I can recall. Keith Rosemond in- <br /> spected the site and had numerous contacts with him. <br /> #13 6-2-93. <br />
The URL can be used to link to this page
Your browser does not support the video tag.