Browse
Search
Agenda - 02-07-2017 - 8-a - Durham Chapel Hill Carrboro Metropolitan Planning Organization Comprehensive Transportation Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 02-07-2017 - Regular Mtg.
>
Agenda - 02-07-2017 - 8-a - Durham Chapel Hill Carrboro Metropolitan Planning Organization Comprehensive Transportation Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2017 4:38:48 PM
Creation date
2/3/2017 8:34:37 AM
Metadata
Fields
Template:
BOCC
Date
2/7/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 02-07-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39 <br /> Southpoint Auto Park Boulevard to Renaissance Parkway, has four to five lanes to accommodate the <br /> relatively high traffic volume with turn lanes for 1-40 and Renaissance Parkway. The roadway drains to <br /> nearby Jordan Lake and there are over twenty fresh water ponds in the corridor. <br /> Improvements are needed to accommodate projected traffic in order to maintain a Level of Service D <br /> and provide mobility between 1-40 and the growing retail, residential and employment development in <br /> southern Durham County and eastern Chatham County. Improvements might include adding turn lanes <br /> at intersections and widening the current lanes and shoulders at a minimum, or possibly include <br /> additional lanes. <br /> It should be noted that a feasibility study (FS-1008B) was started in 2014 for this section of NC 751 that <br /> collected field data and produced traffic forecasts. Although the feasibility study was not completed, it <br /> can provide details on the need for safety and capacity improvements on this roadway. <br /> This problem statement presents the roadway in four different sections below. <br /> The southern section, from Martha's Chapel Road (SR 1752)to O'Kelly Chapel Road (SR 1731), is a two- <br /> lane major collector with turn lanes at some intersections. It mostly has a 60-foot right-of-way but some <br /> subsections have 90-foot and even 200-foot right-of-way sections. The area is rural but has occasional <br /> churches and small scale commercial development such as nurseries. The 2012 AADT is 8,300 vehicles <br /> per day (vpd) and this volume has been about the same since 2003. The capacity is 12,400 vpd at LOS D. <br /> Although the current volume is well within capacity,the high peak volume split (75%) and the narrow <br /> rural roadway(24 feet overall width) combine to create safety hazards and congestion that is not <br /> common on rural highways. The 2040 volume is expected to increase to 14,000, or a 1.1 V/C ratio, <br /> which will worsen the safety and congestion problems. It is recommended that this southern section be <br /> widened to a four-lane divided boulevard facility. <br /> The middle section, from O'Kelly Chapel Road to Renaissance Parkway, is a two-lane major thoroughfare <br /> with turn lanes at intersections. It mostly has a 60-foot right-of-way but some subsections have up to <br /> 90-foot, and the overall road width is 19 feet to 24 feet. It should be noted that this section connects to <br /> two east-west roads, Stagecoach Road (SR 1107) and O'Kelly Chapel Road, that provide travelers with a <br /> southern alternative to congested 1-40 and NC 54. The area is a mixture of residential and <br /> retail/commercial, and there is ample undeveloped land that is developing at suburban densities. <br /> Recent development includes large single-family or multi-family development. <br /> The 2013 AADT ranges from 9,700 vpd at the southern end to 13,000 vpd at the northern end. The <br /> capacity is 12,700 vpd at LOS D. Although the current volume is close to capacity, the high peak volume <br /> split (65%to 75%), the narrow overall roadway, and multiple driveways and intersections combine to <br /> create many safety hazards and congestion. The 2040 volume is expected to be 18,000 vpd to 21,000 <br /> vpd, resulting in a 1.4 to 1.8 V/C ratio that will increase delay. <br /> The section adjacent to 1-40, from Renaissance Parkway to Southpoint Autopark Boulevard, is a four- <br /> lane major thoroughfare south of 1-40 and a four-lane divided boulevard north of 1-40. It has many right <br /> turn slip lanes and double left turn lanes at the 1-40 and Renaissance Parkway intersections to <br /> accommodate traffic to nearby South Pointe Mall and the adjacent big box and chain retail stores, and <br /> growing office developments. Local planners do not anticipate further widening of this roadway section <br /> because the roadway in some locations are close to buildings and the area to the west is mostly <br /> unbuildable given its proximity to Third Fork Creek and New Hope Creek. <br /> Minimum Problem Statements—Highway—6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.