Browse
Search
Agenda - 08-04-1993 - VIII-D
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 08-04-1993
>
Agenda - 08-04-1993 - VIII-D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 3:28:56 PM
Creation date
1/24/2017 2:30:12 PM
Metadata
Fields
Template:
BOCC
Date
8/4/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-D
Document Relationships
Minutes - 19930804
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> b. Zoning to Existing Commercial Distri ct (EC-5) <br /> - Scattered commercial properties located outside of the Rural <br /> Neighborhood and Rural Community Activity Nodes as identified in the <br /> Land Use Element of the Orange County Comprehensive Plan. <br /> c. Zoning to Existing Industrial District (E-I) <br /> Scattered industrial properties located outside of the Rural Industrial <br /> Activity Node as identified in the Land Use Element of the Orange <br /> County Comprehensive Plan. <br /> d. Zoning to Agricultural Residential (AR) <br /> All parcels not included in a. through c. above. <br /> 3. Z-7-93 New Watershed Protection Overlay Districts <br /> The following zoning overlay districts are proposed to be applied for the purpose of <br /> protecting public drinking water supplies in a manner at least as restrictive as that <br /> mandated by the Environmental Management Commission in carrying out the provisions <br /> of the Watersupply Watershed Protection Act of 1989. <br /> UNIV-CA (University Lake Critical Area Overlay) <br /> One-half mile from the normal pool of University Lake, or to the branch of the <br /> first major tributary, whichever is greater. <br /> An alternative which may also be considered is designation of the entire <br /> University Lake watershed within the University Lake Critical Area Overlay. <br /> b. UNIV-PW (University Lake Protected Watershed Overlay District) <br /> The portion of the drainage basin of University Lake not covered by UNIV-CA. <br /> c. CANE-CA (Cane Creek Critical Area Overlay District) <br /> One-half mile from the normal pool of Cane Creek Reservoir, or to the branch <br /> of the first major tributary, whichever is further. <br /> An alternative which may also be considered is designation of the entire Cane <br /> Creek watershed within the Cane Creek Critical Area Overlay. <br /> CANE-PW (Cane Creek Protected Watershed Overlay District) <br /> The portion of the drainage basin of Cane Creek Reservoir not covered by <br /> CANE-CA. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.