Browse
Search
Agenda - 08-04-1993 - VIII-D
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 08-04-1993
>
Agenda - 08-04-1993 - VIII-D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 3:28:56 PM
Creation date
1/24/2017 2:30:12 PM
Metadata
Fields
Template:
BOCC
Date
8/4/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-D
Document Relationships
Minutes - 19930804
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37 <br /> to bedrock is sufficient and that the soil type and other criteria are met. Where such sites exist <br /> the function of the pond can be enhanced by infiltration into the soil. <br /> High water level Normal water level <br /> Emergency spillway <br /> _A <br /> Dam <br /> '. • : : • • • • • 7.81.1114■ <br /> Baffle <br /> V <br /> Sediment forebay <br /> Riser <br /> Entrance channel Pier to allow fishing Barrel <br /> recreation, and other uses. <br /> Figure 1 : Illustration of a Typical Wet Detention Pond Showing the Various <br /> Components. <br /> Inlet channel High water level <br /> A <br /> Normal water level <br /> Sediment forebay <br /> B High water level <br /> or <br /> Shallow water Normal water level <br /> High water level� ',Normal water level <br /> Deep water for fish, recreation, etc. <br /> DRAFT 2 June 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.