Browse
Search
Agenda - 08-04-1993 - VIII-D
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 08-04-1993
>
Agenda - 08-04-1993 - VIII-D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 3:28:56 PM
Creation date
1/24/2017 2:30:12 PM
Metadata
Fields
Template:
BOCC
Date
8/4/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-D
Document Relationships
Minutes - 19930804
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br /> b. A certification sealed by an engineer or landscape architect (to the extent <br /> that the General Statute, Chapter 89A, allow) stating that the detention <br /> pond is complete and consistent with the plans and specifications. <br /> Submittal of Inspection Report to County Engineer <br /> The Erosion Control Supervisor shall present materials submitted by the <br /> developer and the inspection report and recommendations to the County <br /> Engineer. <br /> a. If the County Engineer approves the inspections report and accepts the <br /> certification, deed and easements, he/she shall file the deed and <br /> easements with the Orange County Register of Deeds, released up to <br /> seventy-five (75) percent of the value of the performance bond or other <br /> security and issue a Watershed Protection Compliance Permit for the <br /> stormwater control structure. <br /> b. If deficiencies are found, the County Engineer shall direct that the <br /> improvements and inspections be made and/or documents corrected and <br /> resubmitted to the County Engineer. <br /> Watershed Protection Compliance Permit Required Prior to Occupancy <br /> No Building Permit or Certificate of Occupancy may be issued in the absence df <br /> a valid Watershed Protection Compliance Permit. <br /> 4 Release of Remaining Security <br /> No sooner than one (1) year after the filing date of the deed, easements and <br /> maintenance agreement, the developer amy petition the Board of Commissioners <br /> to release the remaining value of he performance bond or other security. Upon <br /> receipt of said petition, the County Engineer shall inspect the stormwater control <br /> structure to determine whether the controls are performing as designed and <br /> intended. The County Engineer shall present the petition, inspection report and <br /> recommendations to the Board of Commissioners. <br /> a. If the Board of Commissioners approves the report and accepts the <br /> petition, the developer shall deposit with Orange County a cash amount <br /> equal to that described in Section I, after which, the Board shall release <br /> the performance bond or other security. <br /> b. If the Board of Commissioners does not accept the report and rejects the <br /> petition, it shall provide the developer with instructions to correct any <br /> deficiencies and all steps necessary for the release of the performance <br /> bond or other security. <br /> Annual Inspection Required <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.