Orange County NC Website
!o <br />o~i•"' `•~•, <br />EF~AND SEWER SYSTEM <br />II S <br />Proposal for Rate Study for Small Wastewater Collection Utility <br />SCHEDULE <br />RFC's Project schedule should provide project participants with a common point of reference for project <br />structure and deadlines. The project schedule provided below assumes that data can be obtained and <br />processed in a timely fashion. <br />1 Project Initiation <br />2 Develop Rate Model to Project Revenues & <br />Expenditures <br />3 Forecast Revenue Requirements <br />4 Rate Calculation <br />5 Finalize Rate Model & Report <br />6 Presentation of Results (Optional) <br />March April May <br />1 2 3 4 1 2 3 4 1 2 3 4 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Represents trip to Efland <br />Represents key deliverables: the draft report, final report, and delivery of the rate model. <br />ONSULTANTS, NC.90 <br />