Browse
Search
Agenda - 06-29-1993 - VIII-D
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 06-29-1993
>
Agenda - 06-29-1993 - VIII-D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 12:18:48 PM
Creation date
1/23/2017 12:17:54 PM
Metadata
Fields
Template:
BOCC
Date
6/29/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-D
Document Relationships
Minutes - 19930629
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> TABLE 6. 1 <br /> COSTS FOR TRANSMISSION OF 10 MGD OF RAW WATER <br /> FROM JORDAN LAKE TO ORANGE COUNTY <br /> First Costs Costs in 1987 Dollars <br /> Intake, Pumping <br /> Stations and Pipeline $ 8,900,000 <br /> Water Cost 600,000 <br /> GAC Treatment 6,000,000 <br /> Engineering and Contingencies 4.700.000 <br /> 1 Total First Cost $20,200,000 <br /> Annual Costs <br /> Pumping Costs $ 310,000 <br /> GAC Treatment* 510,000 <br /> Operation and Maintenance 80.000 <br /> Total Annual Costs $ 900,000 <br /> A Present Worth of Annual Costs . $11 ,000,000 <br /> .s <br /> Total Project Cost $31 .200.000 <br /> Cost per gallon of supply $3.12 <br /> *Granular activated carbon (GAC) treatment: refer to discussion under <br /> Water Quality in this section. <br /> The following paragraphs discuss the major considerations involved in <br /> developing the project' s costs shown in Table 6. 1 . <br /> Lake Intake <br /> The lake intake facility will be a critical component in any proposal to <br /> develop Jordan Lake for water supply. The Environmental Management Commission <br /> will likely restrict the total number of intakes at the lake to two or three <br /> 4 <br /> structures due to the limited number of sites that meet water quality goals <br /> and other design criteria. The Commission also wishes to minimize the effects <br /> I <br /> I <br /> 6-3 <br /> c <br />
The URL can be used to link to this page
Your browser does not support the video tag.