Browse
Search
Agenda - 06-29-1993 - VIII-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 06-29-1993
>
Agenda - 06-29-1993 - VIII-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 12:22:36 PM
Creation date
1/23/2017 12:17:01 PM
Metadata
Fields
Template:
BOCC
Date
6/29/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-B
Document Relationships
Minutes - 19930629
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> 6/24/93 <br /> SOUTHERN HUMAN SERVICES BUILDING <br /> Chapel Hill, NC <br /> • Project #9316 <br /> EXHIBIT "A" <br /> MODIFICATIONS OF THE STANDARD AlA CONTRACT DOCUMENT B141 <br /> THE FOLLOWING SECTTONS ARE MODIFTED TO READ: <br /> Article 1, paragraph 1 .1 . 2: The Architect's services shall be <br /> performed as expeditiously as is consistent with professional <br /> skill and care and the orderly progress of the work. Upon <br /> request of the Owner, the Architect shall Submit for the Owner s <br /> approval a schedule for the performance of the Architect's <br /> services which may be adjusted by mutual agreement of the Owner <br /> and the Architect, as the project proceeds, and shall include <br /> allowances for periods of time required for the Owner's review <br /> and for the approval of submissions by authorities having <br /> jurisdiction over the Project. Time limits established by this <br /> schedule approved by the Owner shall not, except for reasonable <br /> cause, be exceeded by the Architect or Owner. <br /> Article 2, paragraph 2. 2.1: The Architect shall furnish a <br /> program to the Owner, as Basic Services, to ascertain the <br /> requirements of the Project and shall arrive at a mutual <br /> understanding of such requirements with the Owner, and shall <br /> submit such understanding in writing, and shall furnish a copy to <br /> the Owner for its approval before proceeding with preliminary <br /> designs . <br /> Article 2, paragraph 2.4.1: Based on the approved Design <br /> Development documents and any further adjustments in the scope or <br /> quality of the Project, or in the construction budget authorized <br /> by the Owner, the Architect shall prepare, for approval by the <br /> Owner, Contruction Documents consisting of Drawings and <br /> Specifications setting forth in detail the work required for the <br /> Architectural, Structural, Mechanical, Electrical, service- <br /> connected equipment, and site work, and the necessary general <br /> conditions of the Contract. He shall provide the services of <br /> Professional Structural, Mechanical, Civil and Electrical <br /> Engineers, qualified by training and experience in their <br /> respective fields as needed to address the requirements of the <br /> project as defined herein; and shall require such <br /> professional engineers to place their seal, name and signature on <br /> the drawings and specifications prepared by them. <br /> Article 2, paragraph 2.4.2: The Architect, after consultation <br /> with Owner, shall prepare the necessary bidding information and <br /> bid forms to comply with public building laws as set forth in <br /> North Carolina General Statutes Chapter 143, including the <br /> necessary information required by Chapter 87 of the North <br /> Carolina General Statutes pertaining to the licensing of <br /> contractors, and shall assist the Owner in the preparation of the <br /> conditions of the contract and the form of the agreement <br /> between the Owner and the General and Prime Contractors. <br /> -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.